Mudmat Reinforcement for Pile Anchor Load Capacity

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing pile anchor installations in the oil and gas industry face reduced load capacity due to environmental or operational factors such as soil erosion, inadequate penetration, or increased loads, necessitating costly and time-consuming replacement or redesign.

Innovation Solution

A pile anchor reinforcement system comprising a mudmat and reinforcing piles that are extendable through the mudmat's aperture to penetrate the seafloor, cooperatively reinforcing the pile anchor against lateral and vertical loading, thereby enhancing its capacity without replacing existing components.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Strength

If pile anchor replacement is performed to restore load capacity, then the load-bearing capacity is restored, but operational disruption and cost increase

Engineering Contradiction:
Improveload-bearing capacityVSAvoidoperational disruption
Core Design Contradiction:
StrengthVSLoss of time

Solution Approach 1:

The solution segments the reinforcement system into modular components: a mudmat with multiple apertures and multiple reinforcing piles that can be independently installed. This allows the reinforcement to be applied without replacing the entire pile anchor system, thereby restoring load capacity while minimizing operational disruption.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The reinforcing piles are installed through apertures in the mudmat, creating a nested structure where the mudmat encompasses the pile anchor and the reinforcing piles extend through the mudmat. This nested configuration allows the reinforcement system to integrate with the existing pile anchor without requiring removal or replacement of the original components.

Inventive Principle:
Principle #7Nested doll (Nesting)

2Strength

If pile anchor replacement is performed to restore load capacity, then the load-bearing capacity is restored, but cost increases

Engineering Contradiction:
Improveload-bearing capacityVSAvoidcost
Core Design Contradiction:
StrengthVSQuantity of substance

Solution Approach 1:

The reinforcement is applied locally at specific positions around the pile anchor through the mudmat apertures, rather than replacing the entire pile anchor system. This localized approach uses materials only where needed to restore load capacity, significantly reducing material costs and overall project expense.

Inventive Principle:
Principle #3Local quality

Solution Approach 2:

The solution extracts only the necessary reinforcing elements (mudmat and reinforcing piles) from a complete replacement system. By taking out only the specific components needed to restore load capacity rather than replacing the entire pile anchor, the cost is reduced while still achieving the strength restoration goal.

Inventive Principle:
Principle #2Taking out (Extraction)

3Strength

If pile penetration is increased during installation to improve holding capacity, then holding capacity increases, but installation complexity and time increase

Engineering Contradiction:
Improveholding capacityVSAvoidinstallation complexity
Core Design Contradiction:
StrengthVSDevice complexity

Solution Approach 1:

The mudmat is positioned and apertures are prepared in advance before the reinforcing piles are installed. This preliminary preparation simplifies the subsequent pile installation process by providing pre-positioned guidance paths, reducing installation complexity while ensuring proper positioning for maximum holding capacity.

Inventive Principle:
Principle #10Preliminary action

4Stability of the object's composition

If mooring line embedding is reduced to prevent scour and trenching, then soil stability improves, but mooring line attachment options are limited

Engineering Contradiction:
Improvesoil stabilityVSAvoidmooring line attachment options
Core Design Contradiction:
Stability of the object's compositionVSAdaptability or versatility

Solution Approach 1:

The mudmat acts as an intermediary between the mooring line attachment point and the seabed soil. By providing a stable platform on the seabed surface, the mudmat allows mooring lines to be attached without direct embedding in the soil, thereby preventing scour and trenching while maintaining attachment versatility through multiple aperture positions.

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentUS10870965B2Mat incorporated pile anchor reinforcement systems
Publication Date: 2020.12.22 EXXONMOBIL UPSTREAM RESEARCH COMPANY(US)
  • US10870965B2 patent drawing
  • US10870965B2 patent drawing
  • US10870965B2 patent drawing

AI summary

A pile anchor reinforcing system includes a pile anchor having an end penetrating a seafloor, and a mudmat positionable on the seafloor and defining a reinforcing pile aperture or a surface area to receive a gravity anchor or both, and a pile anchor aperture sized to receive the pile anchor. A reinforcing pile is extendable through the reinforcing aperture and penetrates the seafloor. The mudmat and the reinforcing pile and/or the gravity anchor cooperatively reinforce the pile anchor against lateral and vertical loading.