Multi-Dosing Valve Gas Supply for ALD Step Coverage

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In atomic layer deposition (ALD) processes, deposition gases often decompose before reaching the bottom surface of openings with high aspect ratios, leading to deteriorated step coverage in memory devices like VNAND, due to insufficient pressure and premature decomposition.

Innovation Solution

A gas supply system with multiple gas filling tanks and a multi-dosing valve assembly that sequentially supplies gases to the process chamber, maintaining high pressure and preventing backflow to ensure effective deposition, thereby improving step coverage and Unit Per Equipment Hour (UPEH) performance.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Stress or pressure

If a single gas supply source is used, then the device complexity is low, but the gas pressure is insufficient causing decomposition before reaching the bottom surface

Engineering Contradiction:
Improvegas pressureVSAvoiddevice complexity
Core Design Contradiction:
Stress or pressureVSDevice complexity

Solution Approach 1:

The gas supply system is divided into multiple gas filling tanks (first gas filling tank, second gas filling tank, etc.) that can be charged and discharged sequentially. This segmentation allows the system to maintain higher pressure by refilling gas from additional tanks when the first tank is depleted, thereby preventing gas decomposition before reaching the bottom surface of high aspect ratio openings.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The gas filling tanks are pre-charged with deposition gas before the deposition process begins. This preliminary action ensures that when gas is needed during deposition, it is already available at the required pressure, eliminating the need for real-time compression and preventing gas decomposition due to pressure loss.

Inventive Principle:
Principle #10Preliminary action

2Reliability

If gas is supplied continuously, then the deposition process is efficient, but gas decomposition occurs before reaching the target surface

Engineering Contradiction:
Improvedeposition qualityVSAvoiddeposition efficiency
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The system employs periodic charging and discharging of multiple gas filling tanks in sequence. When the first tank is discharged, the second tank is charged and then discharged, creating a periodic replenishment cycle. This ensures continuous supply of fresh, high-pressure gas to the deposition chamber, maintaining both deposition quality and efficiency without gas decomposition.

Inventive Principle:
Principle #19Periodic action

3Manufacturing precision

If the gas supply system is simplified, then the ease of manufacture is high, but step coverage deteriorates due to gas decomposition

Engineering Contradiction:
Improvestep coverageVSAvoidease of manufacture
Core Design Contradiction:
Manufacturing precisionVSEase of manufacture

Solution Approach 1:

The gas supply system is segmented into multiple independently controllable gas filling tanks with separate charging and discharging mechanisms. This segmentation allows precise control over gas flow timing and pressure, ensuring that fresh high-pressure gas reaches the bottom surface of high aspect ratio openings, thereby improving step coverage while maintaining a relatively simple overall system architecture.

Inventive Principle:
Principle #1Segmentation

4Manufacturing precision

If equipment is remodeled to improve gas supply, then the step coverage improves, but the productivity decreases due to equipment downtime

Engineering Contradiction:
Improvestep coverageVSAvoidUPEH
Core Design Contradiction:
Manufacturing precisionVSProductivity

Solution Approach 1:

Gas filling tanks are pre-charged with deposition gas during idle periods or between production batches. This preliminary charging action ensures that when deposition is required, the system can immediately switch to using pre-charged tanks without requiring equipment remodeling or downtime, thereby maintaining both improved step coverage and high productivity.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system uses multiple gas filling tanks that can be operated in sequence. When one tank is depleted, the system automatically switches to another pre-charged tank, effectively discarding the depleted tank temporarily while recovering productivity through continuous operation with alternative tanks. This eliminates downtime associated with equipment remodeling or single-tank recharging.

Inventive Principle:
Principle #34Discarding and recovering

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

The solution enhances the step coverage characteristics of thin films and improves UPEH by maintaining high pressure and preventing gas decomposition, allowing for efficient layer deposition without the need for equipment remodeling.

Implementation Method 1

Each of the gas filling tanks may be pressurized with a first gas from the first gas supply source

Methodology Applied
Scientific EffectPressure: Pressure Increase

Implementation Method 2

a multi-dosing valve assembly connected to outlet portions of the gas filling tanks that is configured to supply, sequentially, the first gas from the gas filling tanks to a process chamber

Methodology Applied
Scientific EffectGas flow control:

Data Source

PatentUS11220748B2Gas supply and layer deposition apparatus including the same
Publication Date: 2022.01.11 SAMSUNG ELECTRONICS CO LTD
  • US11220748B2 patent drawing
  • US11220748B2 patent drawing
  • US11220748B2 patent drawing

AI summary

A gas supply for a layer deposition apparatus including a plurality of charge distribution lines connected to a first gas supply source and a plurality of gas filling tanks respectively connected to the charge distribution lines is disclosed. Each of the gas filling tanks may be pressurized with a first gas from the first gas supply source, and a gas supply line connected to a second gas supply source. The apparatus may include a multi-dosing valve assembly connected to outlet portions of the gas filling tanks and configured to supply, sequentially, the first gas from the gas filling tanks to a process chamber. The multi-dosing valve assembly may include a flow path block having a main supply line connected to the process chamber and a backflow prevention valve block fastened to the flow path block and having an opening/closing valve therein.