Multi-function Drilling Rig With Movable Machines

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional drilling methods require moving drilling rigs between wellbores, leading to inefficiencies when drilling multiple wellbores close to each other, as much time is spent relocating the rig rather than drilling.

Innovation Solution

A multi-function rig system that allows for drilling, completion, and workover operations on multiple wellbores from a single location without moving the entire rig, using movable machines and tubular movement apparatuses to position drilling equipment at multiple wellbore sites from a central rig structure.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If a single drilling rig is used to drill multiple wellbores by relocating it between sites, then the rig structure remains simple and portable, but the time and productivity are reduced due to repeated relocation

Engineering Contradiction:
Improvedrilling efficiencyVSAvoidrelocation time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The drilling system is divided into a stationary rig structure and multiple movable drilling machines. The rig structure remains fixed while individual drilling machines (such as top drives, rotary tables, and mud pumps) are moved between wellbore locations using overhead cranes and rail systems, eliminating the need to relocate the entire rig.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system transitions from a static rig configuration to a dynamic one where drilling machines can be repositioned along the rig floor. The overhead crane system with movable trolleys and hooks enables flexible positioning of drilling equipment to different wellbore locations without moving the rig foundation.

Inventive Principle:
Principle #15Dynamics

2Productivity

If multiple drilling rigs are deployed to drill multiple wellbores simultaneously, then productivity increases, but the cost and complexity of the operation increase significantly

Engineering Contradiction:
Improvedrilling outputVSAvoidrig system complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

A single rig structure is designed to support multiple drilling machines that can service multiple wellbores. The rig floor includes multiple wellbore locations with corresponding drilling equipment, allowing one rig to perform the functions of multiple separate rigs through the movement and reconfiguration of drilling machines.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

An overhead crane system acts as an intermediary mechanism that enables the transfer and repositioning of drilling machines between different wellbore locations. This mediator system allows a single rig structure to efficiently manage multiple drilling operations without requiring multiple independent rig systems.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Ease of operation

If the entire drilling rig is relocated between wellbores, then equipment portability is maintained, but operational time and efficiency are reduced

Engineering Contradiction:
Improverig mobilityVSAvoiddrilling speed
Core Design Contradiction:
Ease of operationVSProductivity

Solution Approach 1:

The drilling system is divided into a stationary rig structure and multiple movable drilling machines. The rig structure remains fixed while individual drilling machines (such as top drives, rotary tables, and mud pumps) are moved between wellbore locations using overhead cranes and rail systems, eliminating the need to relocate the entire rig.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

Drilling machines are pre-positioned on the rig floor at various wellbore locations before drilling operations begin. The overhead crane system is prepared in advance to quickly relocate drilling machines between locations as needed, minimizing downtime and maintaining continuous productivity.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS8181698B2Multi-function multi-hole drilling rig
Publication Date: 2012.05.22 NAT OILWELL VARCO LP
  • US8181698B2 patent drawing
  • US8181698B2 patent drawing
  • US8181698B2 patent drawing

AI summary

A multi-function multi-hole rig including multiple machines for accomplishing various rig functions, e.g., drilling machine(s), tripping machine(s), casing machine(s), cementing machine(s), workover machine(s), etc., for drilling, completing and/or working over multiple wellbores without moving the rig. Rig functions may be performed one after the other and/or simultaneously, while allowing other functions related to completion and production to continue simultaneously.