Problem

Existing power delivery methods through power lines or cables are designed for single power supply and lack a mechanism to confirm if a power sink device is connected, potentially leading to dangerous situations when power is supplied without stable connections.

Innovation Solution

A power delivery method and electronic device system that selectively provide multiple power signals, with the first electronic device outputting only a first power signal until a hot plug notification signal is received, then outputting both power signals, ensuring safe delivery and connection verification.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If power source directly provides power onto the power line without confirming connection, then power delivery speed is improved, but safety and reliability deteriorate due to potential dangerous situations when terminals are not stably connected

Engineering Contradiction:
Improvepower delivery speedVSAvoidconnection safety
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The system performs preliminary connection verification by detecting hot plug notification signals before enabling full power delivery. The power source first establishes a basic connection state, then waits for confirmation signals indicating stable connection before activating higher power levels, thus preventing dangerous situations while maintaining efficient power transfer.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The power delivery system dynamically adjusts power levels based on connection status. It transitions from a first power signal during connection verification to multiple power signals including second power signal after hot plug notification is received, allowing the system to adapt power delivery to the actual connection state for both safety and efficiency.

Inventive Principle:
Principle #15Dynamics

2Reliability

If power source waits to confirm connection before providing power, then safety is improved, but power delivery time increases due to verification delay

Engineering Contradiction:
Improveconnection safetyVSAvoidpower delivery time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The system performs preliminary connection verification by detecting hot plug notification signals before enabling full power delivery. The power source first establishes a basic connection state, then waits for confirmation signals indicating stable connection before activating higher power levels, thus preventing dangerous situations while maintaining efficient power transfer.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system maintains continuous useful action by providing the first power signal throughout the connection verification process. Rather than completely stopping power delivery during verification, the system continues to supply basic power while awaiting hot plug notification, minimizing time loss while ensuring safety before full power activation.

Inventive Principle:
Principle #20Continuity of useful action

3Device complexity

If existing single power supply design is used, then device complexity is reduced, but adaptability deteriorates as no special power delivery mechanism exists for multiple power signals

Engineering Contradiction:
Improvepower delivery mechanismVSAvoidmulti-power signal delivery
Core Design Contradiction:
Device complexityVSAdaptability or versatility

Solution Approach 1:

The system implements multi-functionality by enabling a single power line to deliver multiple power signals (first power signal and second power signal) based on connection status. The power source can selectively provide different power levels and types through the same power line, making the system adaptable to various device requirements without adding separate dedicated power lines for each function.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The system changes power delivery parameters dynamically based on connection verification. It transitions from providing only the first power signal during verification to providing both first and second power signals after hot plug notification, allowing the same power delivery mechanism to adapt to different operational states and device requirements without structural modification.

Inventive Principle:
Principle #35Parameter changes

Data Source

PatentUS11493944B2Electronic device system and power delivery method
Publication Date: 2022.11.08 REALTEK SEMICON CORP
  • US11493944B2 patent drawing
  • US11493944B2 patent drawing

AI summary

An electronic device system includes a first electronic device and a power delivery device. The first electronic device is arranged to selectively provide multiple power signals. The power delivery device is arranged to deliver one or more of the power signals. The power signals at least include a first power signal and a second power signal. When the first electronic device detects that the power delivery device is connected to the first electronic device and before a hot plug notification signal is received, the first electronic device provides only the first power signal to the power delivery device. After the first electronic device has received the hot plug notification signal, the first electronic device provides both the first power signal and the second power signal to the power delivery device.