Multi-tenant Software Update Isolation via Phased Transition

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In multi-tenant software architectures, updating or modifying the core software platform can be complex and unpredictable due to varying reactions of tenant-specific data objects and configurations, leading to potential errors and prolonged downtime, especially when dependencies between core and tenant content are intricate.

Innovation Solution

A method is implemented to transition a multi-tenant system from a current to a target state by identifying and addressing errors in tenant-specific content in parallel, suspending the transition for affected tenants while continuing for others, and reactivating the system after a scheduled downtime, allowing for phased updates and corrections to be applied individually without affecting other tenants.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If a multi-tenant system performs standardized updates to the core software platform, then consistency and reliability are improved, but errors in tenant-specific content can cause prolonged downtime and affect multiple tenants

Engineering Contradiction:
Improvesystem reliabilityVSAvoiddowntime
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The system divides the multi-tenant update process into independent tenant-specific phases. Each tenant's content is processed separately during the second phase, allowing errors to be isolated to individual tenants rather than affecting the entire system. This segmentation enables parallel processing of multiple tenants while maintaining system-wide reliability.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system performs preliminary error detection and analysis during the second phase before finalizing the update. By identifying and analyzing errors in tenant-specific content beforehand, the system can correct issues proactively and prevent prolonged downtime, ensuring a smoother transition to the target state.

Inventive Principle:
Principle #10Preliminary action

2Productivity

If the system processes tenant-specific content in parallel during the second phase, then productivity is improved, but error detection and correction become more complex

Engineering Contradiction:
Improveupdate speedVSAvoiderror management complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The system implements comprehensive feedback mechanisms during parallel processing of tenant-specific content. Error detection, analysis, and correction results are fed back to control the progression of each tenant's update process. This feedback loop enables automatic error handling while maintaining parallel processing efficiency, reducing the perceived complexity through systematic error management.

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The system introduces an intermediary error analysis and management layer that coordinates parallel processing across multiple tenants. This intermediary component handles error detection, analysis, and correction uniformly across all tenants, simplifying the management of parallel processes while maintaining high productivity through standardized error handling procedures.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Productivity

If the system allows individual tenant error correction without suspending the entire update process, then continuity is improved, but ensuring consistent state transitions across all tenants becomes more difficult

Engineering Contradiction:
Improveupdate continuityVSAvoidstate transition consistency
Core Design Contradiction:
ProductivityVSManufacturing precision

Solution Approach 1:

The system segments the update process into distinct phases: a first phase for core software platform content that ensures consistency across all tenants, and a second phase for tenant-specific content that allows individual error correction. This segmentation enables continuous updates for unaffected tenants while maintaining precise state transitions through the standardized first phase.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system changes the processing parameters for different phases: the first phase uses synchronized, system-wide parameters to ensure consistency, while the second phase allows tenant-specific parameter variations for error correction. This parameter differentiation enables both continuity and precision in state transitions across multiple tenants.

Inventive Principle:
Principle #35Parameter changes

Data Source

PatentUS8775862B2Tenant rescue for software change processes in multi-tenant architectures
Publication Date: 2014.07.08 SAP SE
  • US8775862B2 patent drawing
  • US8775862B2 patent drawing
  • US8775862B2 patent drawing

AI summary

A multi-tenant system can be switched to a downtime state to implement a transition from a current state to a target state of a core software platform. During a second phase of the transition an error associated with tenant-specific content of a first customer tenant of the plurality of customer tenants of the multi-tenant system can be identified. The second phase can be suspended for the first customer tenant while continuing the second phase for a remainder of the plurality of customer tenants for which an error has not been identified. After a scheduled duration of the downtime state, the multi-tenant system can be reactivated such that the multi-tenant system includes the remainder of the plurality of customer tenants with the transition implemented and the first customer tenant either with the transition implemented if the error has been corrected or without the transition implemented if the error has not been corrected.