Multilateral Well Acid Stimulation via Junction and Seal

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Performing acid stimulation without intervention in multilateral wells is challenging due to the need for extra trips with downhole service tools, which complicates the process and increases operational complexity.

Innovation Solution

A method involving pre-milled windows, casing orientation tools, and fluid loss devices allows for acid stimulation of lateral wellbores without intervention by sealing the main wellbore, enabling hydraulic communication and mechanical access through a junction, allowing stimulation and subsequent comingled flow without the need for additional tool trips.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If traditional acid stimulation method is used in multilateral wells, then stimulation can be performed, but extra trips with downhole service tools are required increasing operational complexity and time

Engineering Contradiction:
Improveacid stimulation efficiencyVSAvoidoperational complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The main wellbore is sealed and prepared in advance before lateral stimulation, establishing the necessary conditions (seal integrity, hydraulic isolation) before the actual stimulation operation, thereby enabling single-trip intervention-free stimulation

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

A junction tool serves as an intermediary device between the main wellbore and lateral wellbores, providing mechanical access and hydraulic communication without requiring direct downhole service tool intervention during stimulation, thus reducing operational complexity

Inventive Principle:
Principle #24Intermediary (Mediator)

2Ease of operation

If sealing the main wellbore is implemented, then intervention-free stimulation is enabled, but seal integrity must be maintained throughout the process

Engineering Contradiction:
Improveintervention-free operationVSAvoidseal integrity
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

The seal system is designed to maintain its own integrity through the stimulation process without requiring external intervention or monitoring, allowing the sealing function to be self-sustaining from setup through stimulation to production

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The seal is designed and positioned in advance to accommodate the entire stimulation process, including pressure variations and fluid flow changes, ensuring reliability is built into the system before operation begins

Inventive Principle:
Principle #11Beforehand cushioning (Prior cushioning)

3Productivity

If lateral wellbores are stimulated through the junction, then comingled flow is achieved, but hydraulic communication must be established beforehand

Engineering Contradiction:
Improvecomingled production capabilityVSAvoidhydraulic communication setup
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The junction tool merges the hydraulic systems of the main wellbore and lateral wellbores into a single integrated flow path, enabling comingled production where fluids from multiple zones combine and flow together through a unified completion system

Inventive Principle:
Principle #5Merging (Combining)

Data Source

PatentUS11448051B2Multilateral acid stimulation process
Publication Date: 2022.09.20 HALLIBURTON ENERGY SERVICES INC
  • US11448051B2 patent drawing
  • US11448051B2 patent drawing
  • US11448051B2 patent drawing

AI summary

A main well bore is drilled. The main well bore is completed and stimulated. The main well bore is sealed. A lateral well bore is drilled off the main well bore. A junction that allows communication with the lateral well bore and that connects the main well bore is inserted. The lateral well bore is stimulated through the junction. The main well bore is unsealed, allowing comingled flow from the main bore and the lateral bore.