Network Intent Feedback Control for Sub-Intent Fulfillment
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
Existing network management systems face inefficiencies in managing network management intents, leading to unnecessary resource waste when a target is exceeded in fulfilling network management sub-intents.
Innovation Solution
A method for managing network management intents involves sending decomposed sub-intents to producer entities, receiving execution results, and adjusting management actions based on performance indicators and indication information to ensure appropriate fulfillment without unnecessary replacements.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Reliability
If a network management service producer entity replaces a management action group when a target of a network management sub-intent fails to be fulfilled, then the target fulfillment is improved, but unnecessary resource waste occurs when the execution result exceeds fulfillment
Solution Approach 1:
The consumer entity receives execution results from producer entities and uses this feedback to determine whether replacement of management action groups is necessary. The system implements a closed-loop control where the consumer entity monitors execution outcomes and adjusts replacement decisions based on whether the overall network management intent is fulfilled, avoiding unnecessary replacements when targets are already exceeded.
Solution Approach 2:
The system changes the decision parameter from binary (replace or not replace based solely on sub-intent failure) to a continuous evaluation based on overall intent fulfillment status. By evaluating whether the execution result exceeds fulfillment of the network management intent target, the system dynamically adjusts the replacement decision to optimize resource usage while ensuring target achievement.
2Productivity
If the consumer entity determines replacement based on sub-intent execution status alone, then quick decision making is achieved, but unnecessary management actions are triggered
Solution Approach 1:
The consumer entity performs a preliminary evaluation of the overall network management intent fulfillment status before triggering management action group replacement. By assessing whether the execution result already exceeds fulfillment of the target, the system prevents unnecessary replacement actions while maintaining quick decision-making capability through a streamlined evaluation process.
Data Source
AI summary
A network management intent management method. The method includes: sending, to N network management service producer entities in a one-to-one manner, N network management sub-intents obtained by decomposing a network management intent; respectively receiving N execution results of the N network management sub-intents, and obtaining an execution result of the network management intent based on the N execution results; and sending, based on the execution result of the network management intent, management indication information to a network management service producer entity that fails to fulfill a target. Therefore, whether the producer entity that fails to fulfill the target is to replace the management action group is determined based on the execution result of the network management intent. This improves a manner of managing the network management intent.


