Node B Uplink Scheduling Using Maximum UE Transmitter Power

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current mobile communication systems face inefficiencies in uplink packet transmission scheduling due to the lack of accurate information about UE transmit power margins, leading to suboptimal resource allocation and decreased channel capacity.

Innovation Solution

A method and apparatus that enable a Node B to receive and utilize the maximum UE transmitter power, calculated as the sum of the UE's transmit power and power margin, to efficiently schedule uplink packet transmissions, ensuring optimal resource allocation based on accurate channel status information.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If the Node B schedules uplink packet transmission based on only Tx power or Tx power margin information, then the scheduling process is simple, but the channel status estimation accuracy is insufficient leading to suboptimal resource allocation

Engineering Contradiction:
Improvechannel status estimation accuracyVSAvoidscheduling information processing complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The patent combines Tx power information and Tx power margin information into a unified maximum UE transmitter power parameter for scheduling decisions. This merging allows the Node B to accurately estimate channel status while maintaining manageable processing complexity through a single integrated parameter rather than handling multiple separate parameters independently.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The patent introduces maximum UE transmitter power as an intermediary parameter that mediates between the UE's actual transmit power and its power margin capabilities. This intermediary enables accurate channel status estimation without requiring the Node B to process multiple complex parameters simultaneously, resolving the contradiction between measurement precision and device complexity.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Productivity

If the Node B allocates resources without accurate maximum UE transmitter power information, then the scheduling decision is fast, but the resource allocation optimality deteriorates leading to decreased channel capacity

Engineering Contradiction:
Improvechannel capacityVSAvoidscheduling decision time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The patent applies preliminary action by having the UE signal its maximum transmitter power capability in advance before actual scheduling decisions are made. This allows the Node B to pre-determine optimal resource allocation parameters based on accurate channel status information, achieving both high channel capacity and fast scheduling decisions without requiring complex real-time calculations.

Inventive Principle:
Principle #10Preliminary action

3Productivity

If the UE signals detailed channel status information including both Tx power and power margin, then the Node B can make optimal scheduling decisions, but the signaling overhead increases

Engineering Contradiction:
Improvescheduling efficiencyVSAvoidsignaling information quantity
Core Design Contradiction:
ProductivityVSQuantity of substance

Solution Approach 1:

The patent extracts the essential scheduling information from the full set of possible UE signaling parameters. By taking out only the maximum UE transmitter power parameter (which combines Tx power and power margin information), the system achieves optimal scheduling decisions while minimizing signaling overhead, avoiding the need to transmit all detailed channel status information.

Inventive Principle:
Principle #2Taking out (Extraction)

Data Source

PatentEP1864405B1Method and apparatus for signaling maximum UE transmitter power information to base station for scheduling of uplink packet transmission in a mobile communication system
Publication Date: 2018.05.30 SAMSUNG ELECTRONICS CO LTD
  • EP1864405B1 patent drawingFigure 1
  • EP1864405B1 patent drawingFigure 2
  • EP1864405B1 patent drawingFigure 3

AI summary

A method and apparatus are provided for signaling a maximum UE transmitter power to a Node B for use in scheduling of uplink packet transmission in a mobile communication system. The Node B receives uplink channel status information from a UE and a maximum UE transmitter power from an RNC. The maximum UE transmitter power is the lower of the maximum allowed UL Tx power and the maximum Tx power of the UE. The Node B then schedules uplink packet transmission from the UE based on the uplink channel status information and the maximum UE transmitter power.