Problem

Existing building management systems (BMS) and lighting control systems face communication issues due to different protocols, requiring intermediary devices like JACE for data exchange, which is costly and time-consuming to install and commission.

Innovation Solution

An occupancy sensing device with both a lighting control interface and a BMS interface allows for direct data exchange between BMS and lighting control systems, translating data between BMS protocols and lighting control protocols without the need for higher-level communication layers or intermediary devices.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If data communication between BMS and lighting control system is carried out via a higher-level intermediary device (e.g., JACE), then communication between the two systems is enabled, but installation, commissioning, and setup become costly and time-consuming

Engineering Contradiction:
Improvecommunication capabilityVSAvoidinstallation and commissioning time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent extracts the communication protocol translation functionality from the higher-level intermediary device and embeds it directly into the lighting control interface device. This allows the lighting control system to communicate directly with the BMS without requiring a separate JACE intermediary, thereby reducing installation and commissioning time while maintaining communication capability

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The lighting control interface device is designed to perform multiple functions: it controls lighting devices according to lighting control protocols and simultaneously translates and communicates with the BMS using BMS protocols. This multi-functionality eliminates the need for a separate intermediary device, reducing both cost and installation time

Inventive Principle:
Principle #6Universality (Multi-functionality)

2Adaptability or versatility

If a higher-level intermediary device is used to enable communication between BMS and lighting control system, then protocol compatibility is achieved, but system complexity and cost increase

Engineering Contradiction:
Improveprotocol compatibilityVSAvoidsystem structure
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The patent merges the lighting control interface and the BMS communication interface into a single integrated device. This device simultaneously handles lighting control protocol communications and BMS protocol translations, eliminating the need for a separate higher-level intermediary device and simplifying the overall system structure

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The lighting control interface device acts as an intermediary between the lighting control system and the BMS, performing protocol translation directly at the interface level. This eliminates the need for a separate higher-level intermediary device while maintaining protocol compatibility between the two systems

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentUS12273979B2Operating a building management system using a lighting control interface
Publication Date: 2025.04.08 HONEYWELL INTERNATIONAL INC
  • US12273979B2 patent drawing
  • US12273979B2 patent drawing
  • US12273979B2 patent drawing

AI summary

Devices, systems, and methods for operating a building management system using a lighting control interface are described herein. One device includes an occupancy sensing component, a lighting control interface configured to connect the occupancy sensing device to a lighting control channel of a building, and a building management system (BMS) interface configured to connect the occupancy sensing device to a BMS channel of the building.