Problem

In double-stud wall construction, the need for sheathing to attach plasterboard safely creates a challenge, especially when using hemp insulated walls where lime plaster must be directly applied to the insulation.

Innovation Solution

A bracing system comprising metal wall braces that attach to two sides of each stud, eliminating the need for sheathing by providing rigidity to the studs and allowing direct application of plaster to the insulation.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If sheathing is installed on the outside walls, then plaster can be safely attached to the walls, but the direct application of plaster to insulation becomes impossible

Engineering Contradiction:
Improveplaster attachment safetyVSAvoidplaster application process
Core Design Contradiction:
ReliabilityVSEase of manufacture

Solution Approach 1:

The patent removes the sheathing layer from the wall construction, extracting this intermediate component that prevented direct plaster application to insulation. By eliminating the sheathing, the system enables direct plaster application while maintaining structural integrity through alternative means (metal braces and insulation board attachment).

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The patent introduces metal braces as an intermediary structural element that provides the necessary rigidity and attachment surface for plaster, replacing the traditional sheathing function. The braces serve as a mediator between the insulation and the plaster, enabling direct application while ensuring safety and stability.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Device complexity

If metal wall braces are attached to provide rigidity to studs, then sheathing becomes unnecessary, but the bracing system complexity increases

Engineering Contradiction:
Improvewall construction simplicityVSAvoidbrace installation process
Core Design Contradiction:
Device complexityVSEase of manufacture

Solution Approach 1:

The metal braces perform multiple functions simultaneously: they provide structural rigidity to the offset studs, serve as attachment points for insulation boards, and create a stable surface for plaster application. This multi-functionality reduces the need for separate sheathing components, simplifying the overall construction process despite the added bracing elements.

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Loss of energy

If offset double stud wall construction is used, then thermal bridging is reduced, but structural stability becomes more challenging to maintain

Engineering Contradiction:
Improvethermal bridging reductionVSAvoidwall structural stability
Core Design Contradiction:
Loss of energyVSStability of the object's composition

Solution Approach 1:

The patent applies metal braces to the offset studs during the framing stage, before insulation and plaster are installed. This preliminary stabilization of the structural framework ensures that the offset configuration maintains sufficient rigidity and stability throughout the construction process, enabling thermal performance benefits without compromising structural integrity.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS20250179790A1Offset double stud wall brace
Publication Date: 2025.06.05 ATTEBERRY WADE
  • US20250179790A1 patent drawing
  • US20250179790A1 patent drawing

AI summary

Double stud walls usually require sheathing, such as plywood. Using a system of bracing between opposing studs eliminates the need for sheathing.