Offshore Jacket Installation Using Pre-Installed Pile Guides

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current methods for installing offshore support structures, such as those for wind turbines, are limited by the need for grouting operations and are sensitive to weather conditions, restricting installation periods and rates, and often require expensive and time-consuming vessel operations.

Innovation Solution

A pre-installation subframe with pile guide holes and angled installation points allows for pile and jacket leg engagement, enabling installation in varied weather conditions and eliminating the need for a standard pile guide template, using a Dynamically Positioned vessel, and incorporating quick-locking mechanisms for faster installation.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Strength

If grouting operations are performed at the same time as or soon after jacket structure emplacement, then strong permanent joints are created, but installation periods are restricted and weather sensitivity increases

Engineering Contradiction:
Improvejoint strengthVSAvoidweather adaptability
Core Design Contradiction:
StrengthVSAdaptability or versatility

Solution Approach 1:

The installation process is divided into distinct phases: first installing the jacket structure without grouting, then performing grouting operations separately later. This segmentation allows the jacket to be installed in a wider range of weather conditions while maintaining the requirement for strong joints through subsequent grouting.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The jacket structure is installed in advance without immediate grouting, allowing the structure to be emplaced in suitable weather conditions first, and then grouted at a later convenient time. This preliminary installation action separates the structural placement from the joint strengthening operation.

Inventive Principle:
Principle #10Preliminary action

2Manufacturing precision

If standard pile guide templates are used for pile installation, then precise pile positioning is achieved, but installation time increases and vessel requirements increase

Engineering Contradiction:
Improvepile positioning precisionVSAvoidinstallation rate
Core Design Contradiction:
Manufacturing precisionVSProductivity

Solution Approach 1:

Installation points with conical guides are pre-attached to the jacket structure legs before offshore installation. These pre-positioned guides eliminate the need for separate pile guide templates, maintaining positioning precision while reducing installation time and vessel requirements.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The pile guiding function is merged with the jacket structure itself by incorporating conical guides into the installation points on the legs. This integration eliminates the need for separate guide templates and reduces the number of installation steps.

Inventive Principle:
Principle #5Merging (Combining)

3Reliability

If jacket structures are installed in series with grouting operations, then structural integrity is ensured, but installation costs increase due to vessel time requirements

Engineering Contradiction:
Improvestructural integrityVSAvoidvessel operation complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The installation process is segmented into jacket installation phase and grouting phase, allowing these operations to be performed at different times with different vessel configurations. This reduces the complexity and cost of vessel operations while maintaining structural integrity through subsequent grouting.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The jacket structure is installed preliminarily without immediate grouting, allowing for simpler vessel operations during installation. Grouting is then performed later when structural integrity can be ensured with potentially different or reduced vessel requirements.

Inventive Principle:
Principle #10Preliminary action

4Manufacturing precision

If conical guides are provided at installation points, then jacket leg alignment is improved, but manufacturing complexity increases

Engineering Contradiction:
Improveleg alignment precisionVSAvoidinstallation point manufacturing
Core Design Contradiction:
Manufacturing precisionVSEase of manufacture

Solution Approach 1:

The conical guide is segmented as a separate component that can be manufactured independently and then attached to the jacket structure legs. This allows the guide to be produced using simple forming processes and then bolted or welded to the leg, maintaining ease of manufacture while providing alignment precision.

Inventive Principle:
Principle #1Segmentation

Data Source

PatentEP2836648B1Offshore structure installation
Publication Date: 2016.04.06 OFFSHORE GRP NEWCASTLE LTD
  • EP2836648B1 patent drawingFigure 1~1b
  • EP2836648B1 patent drawingFigure 2
  • EP2836648B1 patent drawingFigure 3

AI summary

Improved embodiments, apparatus and method relating to the manufacture and installation of offshore steel support structures,known as jackets, for Wind Turbine Generators, including transition pieces thereof.