Offshore Wind Turbine Assembly Vessel with Rotating Crane

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current methods for assembling and installing offshore wind turbines are inefficient, particularly due to the large size and weight of turbines, which require long-distance transportation of fully assembled units, posing challenges in navigation and installation on floating foundations.

Innovation Solution

A wind turbine installation crane system mounted on a vessel with multiple assembly stations and a hoisting device that allows for upending and mounting of turbine components, enabling assembly and installation directly at the wind farm location, reducing the need for long-distance transportation and accommodating larger turbines.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If wind turbines are assembled and installed offshore using traditional methods, then the turbines can be installed at the wind farm location, but the large size and weight of turbines require long-distance transportation of fully assembled units, posing navigation and installation challenges

Engineering Contradiction:
Improveease of installationVSAvoidtransportation complexity
Core Design Contradiction:
Ease of operationVSDevice complexity

Solution Approach 1:

The wind turbine is divided into separate components (foundation, mast, nacelle, blades) that are transported and assembled separately at the wind farm location. This segmentation allows each component to be transported independently, reducing the complexity of transporting fully assembled large turbines while enabling installation at the desired offshore location.

Inventive Principle:
Principle #1Segmentation

2Quantity of substance

If the entire wind turbine is built onshore, then transportation costs and logistical challenges are reduced, but the offshore installation and commissioning operations become more compact and costly

Engineering Contradiction:
Improvetransportation volumeVSAvoidease of offshore installation
Core Design Contradiction:
Quantity of substanceVSEase of manufacture

Solution Approach 1:

Different assembly operations are performed at different locations based on their suitability: component assembly and preparation are done onshore where facilities are available, while the final installation and commissioning are performed offshore at the wind farm location. This local quality approach optimizes each stage of the process at its most suitable location.

Inventive Principle:
Principle #3Local quality

3Reliability

If floating foundation wind turbines are assembled at a port based yard, then the assembly can be done in a controlled environment, but the entire assembled unit must be towed from the assembly location to the remote offshore windfarm location

Engineering Contradiction:
Improveassembly reliabilityVSAvoidinstallation efficiency
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The foundation is prepared and positioned at the wind farm location in advance, and components are assembled onshore beforehand. This preliminary action allows the crane vessel to arrive with pre-assembled components ready for rapid installation, improving productivity by reducing the time required for offshore assembly operations while maintaining reliability through controlled onshore assembly.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS20240301869A1Offshore wind turbine assembly vessel
Publication Date: 2024.09.12 ITREC BV
  • US20240301869A1 patent drawing
  • US20240301869A1 patent drawing
  • US20240301869A1 patent drawing

AI summary

The invention relates to a crane for assembly and installation of offshore wind turbines on an offshore location, to a vessel for assembly and installation of offshore wind turbines on an offshore location, and to a method for assembly and installation of offshore wind turbines on an offshore location. According to the invention the crane is provided with a base section and a top section, wherein the top section is rotatable supported by a bearing, and can be rotated with the wind turbine hoisting device relative to the base section about a vertical axis, wherein a first trolley guide is mounted to a top section of the installation crane for guiding a vertically mobile wind turbine supporting trolley. According to the invention the vessel is provided with one or more assembly stations on different sides of the installation crane.