Problem

In non-volatile semiconductor memory devices, such as flash memory cards, it is challenging to test the electrical continuity between boundary pads on the die and their corresponding wire bonds after the die is secured to the substrate and encased, as these connections become inaccessible for continuity testing.

Innovation Solution

A continuity test circuit is implemented, comprising a pull-up transistor, a pull-down transistor, and control circuitry, which allows for firmware-controlled testing of electrical continuity between boundary pads and wire bonds by determining their connection to either a power supply or ground potential, enabling the determination of electrical continuity without disrupting normal operation.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If the die is secured to the substrate and encased in protective material, then the device achieves proper assembly and protection, but the boundary pad connections become inaccessible for continuity testing

Engineering Contradiction:
Improvedevice assembly reliabilityVSAvoidcontinuity testing accessibility
Core Design Contradiction:
ReliabilityVSDifficulty of detecting and measuring

Solution Approach 1:

The patent introduces an intermediary testing mechanism through the use of control circuitry and test output conductors that mediate between the inaccessible boundary pads and the accessible test equipment. The control circuitry acts as a mediator to enable continuity testing without requiring direct physical access to the boundary pads, resolving the contradiction between sealed assembly and test accessibility.

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The patent replaces the mechanical approach of physical access and manual continuity testing with an electrical signaling system. By using control circuitry to activate test conditions and read output signals, the system substitutes mechanical accessibility requirements with electrical measurement capabilities, allowing continuity testing through the encased device interfaces.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

2Productivity

If continuity testing is performed after encasing, then product testing can be completed, but the testing process becomes more complex and time-consuming

Engineering Contradiction:
Improvetesting completion capabilityVSAvoidtesting process complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The patent implements preliminary action by incorporating the continuity test circuitry and control logic into the device during manufacturing, before final encasing. The test infrastructure is pre-built with the necessary transistors, control circuitry, and output conductors, so that when testing is needed after encasing, the components are already in place and configured, reducing the complexity of the testing process.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent makes the control circuitry multi-functional by designing it to serve both normal device operation and continuity testing purposes. The same control circuitry that manages normal pad operations also enables continuity testing when activated, reducing overall device complexity compared to having separate dedicated test circuits, while still achieving complete product testing capability.

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Ease of operation

If traditional continuity testing methods are used, then simple testing can be performed, but the inaccessible boundary pads cannot be tested

Engineering Contradiction:
Improvetesting simplicityVSAvoidtesting coverage
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

The patent enables the device to test itself through the integrated continuity test circuitry. The device uses its own internal control circuitry to activate test conditions and read test results, eliminating the need for external test equipment to directly access boundary pads. This self-service approach maintains testing simplicity while achieving complete testing coverage of previously inaccessible connections.

Inventive Principle:
Principle #25Self-service

Data Source

PatentUS8614584B2System and method for bonded configuration pad continuity check
Publication Date: 2013.12.24 PALISADE TECH LLP
  • US8614584B2 patent drawing
  • US8614584B2 patent drawing
  • US8614584B2 patent drawing

AI summary

A continuity test circuit for a boundary pad includes a pull-up transistor electrically connected between the boundary pad and a first power supply, and a pull-down transistor electrically connected between the boundary pad and a first reference ground potential. A normal output conductor is electrically connected to have a same electrical state as the boundary pad during normal operation. A continuity test output conductor is electrically connected to have a same electrical state as the boundary pad during continuity test operation. Continuity testing control circuitry is defined to control the pull-up transistor, the pull-down transistor, and the normal output conductor during continuity test operation such that an electrical state present on the continuity test output conductor indicates a status of electrical continuity between the boundary pad and either a second power supply or a second reference ground potential to which the boundary pad should be electrically connected.