Digital Pathology Power-Off Delay for Known Slide Positioning

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional pathology sample processing devices experience an unknown state upon power loss, requiring manual intervention to reposition samples and slides, and may suffer from delayed catastrophic failures due to uninterruptible power supply exhaustion.

Innovation Solution

A power off delay system that controls the pathology sample processing device to position all systems and samples into a known state before power termination, using a processor to manage power switches, uninterruptible power supplies, and sensors to ensure safe shutdown.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Speed

If power is immediately terminated when power switch is pressed or power failure occurs, then the device shuts down quickly, but the system enters an unknown state requiring manual intervention and samples may be damaged

Engineering Contradiction:
Improveshutdown speedVSAvoidsystem state reliability
Core Design Contradiction:
SpeedVSReliability

Solution Approach 1:

The system performs preliminary actions by initiating a controlled shutdown sequence that positions all samples and slides into predetermined safe locations before power is actually terminated. The processor activates motors to move samples to known positions, ensuring the system reaches a reliable state before power cutoff occurs.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system provides beforehand cushioning by implementing a delay mechanism that prevents immediate power termination. During this delay period, the system cushions against potential damage by completing positioning operations and ensuring all components are in safe states before power is actually cut off.

Inventive Principle:
Principle #11Beforehand cushioning (Prior cushioning)

2Duration of action of stationary object

If UPS is added to continue operation during power failure, then operation continuity is improved, but delayed catastrophic failure occurs when UPS exhausts power

Engineering Contradiction:
Improveoperation continuity durationVSAvoidfailure timing reliability
Core Design Contradiction:
Duration of action of stationary objectVSReliability

Solution Approach 1:

When UPS indicates power failure, the system immediately initiates preliminary positioning actions to move all samples and slides to known safe positions before the UPS exhausts its power supply. This ensures that when the delayed catastrophic failure eventually occurs, the system is already in a reliable state.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system uses the UPS power remaining as an intermediary time resource to complete positioning operations. The processor monitors UPS power levels and uses the available power window to execute the positioning sequence, treating the UPS duration as a mediator between power failure detection and actual power cutoff.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Device complexity

If manual intervention is required to reposition samples after power restoration, then device complexity is reduced, but ease of operation deteriorates

Engineering Contradiction:
Improveshutdown control complexityVSAvoidsample repositioning ease
Core Design Contradiction:
Device complexityVSEase of operation

Solution Approach 1:

The system implements self-service by automatically positioning all samples and slides into known states during the controlled shutdown sequence, eliminating the need for manual intervention after power restoration. The processor autonomously manages the positioning operations without user input.

Inventive Principle:
Principle #25Self-service

4Object-affected harmful factors

If power termination is delayed to position samples, then sample safety is improved, but shutdown time increases

Engineering Contradiction:
Improvesample damage protectionVSAvoidshutdown time
Core Design Contradiction:
Object-affected harmful factorsVSLoss of time

Solution Approach 1:

The system performs sample positioning as a preliminary action during the delay period before power termination. By initiating positioning operations immediately upon detecting power shutdown initiation, the system completes sample protection tasks within the available time window, minimizing overall shutdown time while ensuring sample safety.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS12352770B2Power off delay system and method
Publication Date: 2025.07.08 LEICA BIOSYSTEMS IMAGING INC
  • US12352770B2 patent drawing
  • US12352770B2 patent drawing
  • US12352770B2 patent drawing

AI summary

A power off delay system and method is configured to delay termination of electrical power to a digital pathology device in a power off condition. If the apparatus includes a UPS, the power off delay system and method delays termination of electrical power when a power switch is turned off and when a catastrophic power failure occurs. During the delay of the termination of electrical power, the digital pathology device is configured to control the scanning stage system and the glass slide conveyor system and the slide rack conveyor system to place each of these systems into a known state and position all glass slides into a known position prior to the termination of electrical power to the digital pathology device. This allows the digital pathology device to resume normal operation upon power up.