Paving Data Compatibility Check for Road Construction Machines

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In road construction, existing methods often lead to delays and quality issues due to road construction machines being inadequately configured for the paving process, resulting in forced terminations and irregularities in the paved road surface.

Innovation Solution

A method where a paving data record is compared with a property profile of the road construction machine before the start of the process, allowing for the assessment of suitability and potential adjustments or machine selection to prevent process interruptions, using an on-board computer and computing unit to control working components based on the data.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If the paving process starts without prior compatibility verification, then the process can begin immediately, but the road construction machine may be found unsuitable during operation causing process interruption and quality issues

Engineering Contradiction:
Improvepaving process efficiencyVSAvoidpaving process continuity
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The system performs a compatibility check between the installation data set and machine property profile before the paving process begins. This preliminary verification identifies any incompatibilities in advance, allowing operators to address them before starting work, thereby preventing process interruptions while maintaining high productivity

Inventive Principle:
Principle #10Preliminary action

2Reliability

If the installation data set is carefully verified against machine capabilities before paving, then process interruptions are prevented, but additional verification time and complexity are required

Engineering Contradiction:
Improvepaving process continuityVSAvoidpre-process verification time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The system automatically performs the compatibility verification between installation data and machine capabilities without requiring manual operator intervention. The onboard computer autonomously compares the installation data set with the machine property profile and generates suitability assessments, eliminating the need for time-consuming manual checks while ensuring reliable process continuity

Inventive Principle:
Principle #25Self-service

3Reliability

If manual configuration checks are performed before paving, then some compatibility issues can be detected, but the process is time-consuming and prone to human error

Engineering Contradiction:
Improveconfiguration accuracyVSAvoidverification process complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The system replaces manual configuration checking with an automated digital verification process. The onboard computer electronically compares the installation data set parameters against the machine property profile, automatically detecting incompatibilities such as incorrect paving width, thickness, or speed parameters. This digital substitution eliminates human error while simplifying the verification process despite increased system functionality

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

4Manufacturing precision

If the machine is reconfigured or replaced when incompatibility is discovered during paving, then quality can be maintained, but significant delays occur in the operational process

Engineering Contradiction:
Improveroad surface qualityVSAvoidoperational delay
Core Design Contradiction:
Manufacturing precisionVSLoss of time

Solution Approach 1:

The system performs compatibility verification between installation data and machine capabilities before the paving process begins. Any incompatibilities that could affect road surface quality are identified in advance, allowing operators to adjust parameters or select appropriate equipment before starting work, thereby ensuring quality requirements are met without operational delays

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentEP4039883B1Plausibility check of an installation data set for a road construction machine
Publication Date: 2023.07.05 JOSEPH VOEGELE AG
  • EP4039883B1 patent drawingFigure 1
  • EP4039883B1 patent drawingFigure 2~3

AI summary

In a method for installing a road surface, an installation data set is read into an on-board computer (19) of a road construction machine (1). During an installation operation, working components of the road construction machine (1) are controlled for installing the road surface based on the read installation data set. Before the installation operation begins, the installation data set is compared by a processing unit (23) with a property profile of the road construction machine (1) stored in a profile memory (29), and based on the result of the comparison, it is assessed whether the road construction machine (1) is suitable for installing the road surface.