Pinned Display Element for Building Control Data Management

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Building control systems face overwhelming data management challenges for operators who need to monitor and diagnose issues across multiple sites, requiring more efficient and intuitive organizational tools to manage large amounts of building control data effectively.

Innovation Solution

A user interface that allows users to pin selected building control information to a display element, enabling easy access and real-time updates of key parameters without constantly displaying the full information, using a pin display element that can be arranged and managed on the screen.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Loss of information

If building control systems display all available building control data, then complete information is provided, but the amount of information becomes overwhelming and difficult to manage

Engineering Contradiction:
Improvecompleteness of building control informationVSAvoidcomplexity of data presentation
Core Design Contradiction:
Loss of informationVSDevice complexity

Solution Approach 1:

The building control data is segmented into multiple organizational categories (e.g., by building, floor, equipment type, or priority level). The user interface divides the comprehensive data set into manageable groups, allowing operators to view only relevant segments at any given time while maintaining access to the complete data structure through hierarchical navigation.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system adds organizational dimensions to the data presentation, such as hierarchical levels (building → floor → equipment), temporal dimensions (real-time, historical, predictive), and priority dimensions (critical, warning, informational). This multi-dimensional organization allows operators to navigate and filter data along different axes rather than presenting all data in a single flat view.

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

2Reliability

If building control systems provide detailed information for multiple sites, then comprehensive monitoring is achieved, but operators cannot efficiently diagnose and fix problems in a short amount of time

Engineering Contradiction:
Improvemonitoring coverage across multiple sitesVSAvoidproblem diagnosis and resolution speed
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The user interface applies local quality by presenting different levels of detail in different interface regions. Critical alarm information receives prominent, simplified presentation with immediate action options, while non-critical monitoring data is displayed in condensed formats. This allows operators to quickly identify and respond to problems while maintaining comprehensive monitoring capability.

Inventive Principle:
Principle #3Local quality

Solution Approach 2:

The system performs preliminary actions by pre-organizing data according to priority, by building, by equipment type, and by potential problem categories. When an issue arises, the relevant information is already positioned and formatted for quick access, eliminating the need for operators to search through unorganized data during emergency situations.

Inventive Principle:
Principle #10Preliminary action

3Loss of information

If building control systems display all parameters simultaneously, then complete monitoring is provided, but the interface becomes overwhelming and unintuitive

Engineering Contradiction:
Improvecompleteness of parameter dataVSAvoidintuitiveness of data access
Core Design Contradiction:
Loss of informationVSEase of operation

Solution Approach 1:

The user interface is dynamic and adaptive, automatically adjusting the level of detail, organization, and presentation based on operator preferences, current system state, and operational context. Operators can dynamically reorganize data views, collapse or expand hierarchical levels, and customize information density without losing access to complete parameter data.

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The system extracts and highlights only the most relevant parameters and alerts based on current system conditions and operator-defined priorities. Non-critical parameters are extracted from the main view or presented in collapsible sections, allowing operators to focus on essential information while maintaining access to complete parameter sets through on-demand expansion.

Inventive Principle:
Principle #2Taking out (Extraction)

Data Source

PatentUS9471202B2Building control system user interface with pinned display feature
Publication Date: 2016.10.18 HONEYWELL INTERNATIONAL INC
  • US9471202B2 patent drawing
  • US9471202B2 patent drawing
  • US9471202B2 patent drawing

AI summary

Building control systems that include a user interface that is configured to help manage relatively large amounts of building control data in an efficient and intuitive manner. In some cases, subsets of building control information can be associated with display elements such as windows or tabs, which can then be pinned to provide a convenient way to selectively display only certain building control information. In some cases, a pinned display element may display one or more building control parameters, which in some cases, can be user selectable and/or updated over time.