Pivotable Stinger for Marine Pipelaying Vessel

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current S-lay pipelaying vessels face challenges in efficiently laying offshore pipelines with large diameter and deep water applications, particularly when integrating substantial accessories, as existing stinger designs and methods are inadequate for passing accessories with significant dimensions and stiffness over the stinger, leading to complex and time-consuming fitting processes.

Innovation Solution

The vessel design incorporates a pivotable stinger, a J-lay tower, and a displaceable hang-off clamp system, allowing for the support and alignment of accessories during pipelaying, enabling the pipeline and accessories to be laid in J-lay mode while maintaining the efficiency of S-lay operations by pivoting the stinger and relocating the hang-off clamp between S-lay and J-lay positions.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If accessories with significant dimensions and stiffness are integrated into the pipeline, then the pipeline functionality is improved, but the passage of the pipeline over the stinger becomes impossible or extremely difficult

Engineering Contradiction:
Improvepipeline functionality with accessoriesVSAvoidpassage over stinger
Core Design Contradiction:
Adaptability or versatilityVSEase of operation

Solution Approach 1:

The stinger is made pivotable about a horizontal stinger pivot axis, allowing it to change its angle and position dynamically. This enables the stinger to adapt its configuration to accommodate accessories of various sizes and stiffness, allowing the pipeline with accessories to pass over the stinger during S-lay pipelaying operations

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The system changes the geometric parameters of the stinger by pivoting it to different angles. This parameter change allows the stinger to create sufficient clearance and accommodate the passage of pipeline with large-diameter accessories that would otherwise not fit through a fixed stinger configuration

Inventive Principle:
Principle #35Parameter changes

2Adaptability or versatility

If accessories are fitted onto the pipeline using conventional techniques, then the pipeline can be equipped with necessary components, but the process becomes time-consuming and complex

Engineering Contradiction:
Improveaccessory integrationVSAvoidlaying speed
Core Design Contradiction:
Adaptability or versatilityVSProductivity

Solution Approach 1:

The hang-off clamp is positioned and configured in advance at the appropriate location on the pipeline. This preliminary positioning allows for efficient accessory installation at the correct spot during the pipelaying process, avoiding the need for time-consuming repositioning operations later

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The hang-off clamp serves multiple functions: it supports the pipeline weight, positions the pipeline for accessory installation, and maintains pipeline stability during the fitting process. This multi-functionality reduces the need for additional specialized equipment and streamlines the overall accessory integration process

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Stability of the object's composition

If a fixed stinger design is used, then the structure is simple and stable, but it cannot accommodate accessories with significant dimensions

Engineering Contradiction:
Improvestinger structural stabilityVSAvoidaccessory accommodation
Core Design Contradiction:
Stability of the object's compositionVSAdaptability or versatility

Solution Approach 1:

The stinger is made pivotable about a horizontal stinger pivot axis, allowing it to change its angle and position dynamically. This enables the stinger to adapt its configuration to accommodate accessories of various sizes and stiffness, allowing the pipeline with accessories to pass over the stinger during S-lay pipelaying operations

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The stinger system is divided into pivotable sections that can independently adjust their angles. This segmentation allows different parts of the stinger to move to accommodate the accessory while maintaining overall structural stability and support

Inventive Principle:
Principle #1Segmentation

Data Source

PatentUS9080696B2Marine pipelaying vessel and method for pipelaying
Publication Date: 2015.07.14 ITREC BV
  • US9080696B2 patent drawing
  • US9080696B2 patent drawing
  • US9080696B2 patent drawing

AI summary

The present invention relates to a marine pipelaying vessel for S-lay pipelaying an offshore pipeline and integrating one or more accessories into the pipeline, and a method for S-lay pipelaying wherein use is made of such a vessel. The vessel according to the invention comprises a hull (1) having a stinger end and a stinger (20) for guiding the launched pipeline in a curved pipeline trajectory, which stinger is pivotably connected to the hull, and an accessory handling J-lay tower (30) at the stinger end of the hull. The J-lay tower allows the pipeline and connected accessory to be laid in J-lay mode while connecting further pipe sections to the pipeline at least until the accessory has been lowered past below the retracted stinger. A stinger support assembly (15) is provided for supporting the stinger in a pipelay position, and for allowing movement of the stinger between the pipelay position and a steep downwardly pivoted retracted position by pivoting the stinger about its stinger pivot axis, wherein the stinger in the retracted position is away from the J-lay firing line.