Building Plan Comment Management with Metadata Correction Lists

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional construction document management systems lack the capability to effectively associate, modify, and generate reports on comments related to construction plans, limiting the ability of entities involved in construction projects to collaborate and track changes.

Innovation Solution

A system and method for managing design-related documents, enabling users to search, filter, and report on comments by utilizing metadata such as category, subcategory, project type, and discipline, with features like pre-rendering documents at different magnifications and colors for faster presentation, and providing event-driven notifications and workflow management.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If conventional hardcopy blueprint type drawings or simple electronic drawings are used, then the system is simple and easy to operate, but the capability to associate, modify, and generate reports on comments is insufficient

Engineering Contradiction:
Improvecapability to associate, modify, and generate reports on commentsVSAvoidsystem complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The patent merges the plan document display functionality with comment association and management capabilities into a single integrated system. The comment pop-up window is directly overlaid on the plan document, allowing users to associate comments with specific coordinates without switching between separate applications or interfaces. This integration resolves the contradiction by providing enhanced adaptability while maintaining operational simplicity through a unified interface.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The system provides multi-functionality by enabling the same interface to perform multiple tasks: displaying plan documents, managing comments, generating reports, and coordinating among multiple entities. The platform serves architects, design firms, contractors, and public agencies simultaneously, allowing each entity to modify and comment on plans while the system automatically manages associations and generates comprehensive reports. This universality achieves high adaptability without proportionally increasing complexity.

Inventive Principle:
Principle #6Universality (Multi-functionality)

2Loss of information

If conventional systems are used for plan management, then the system structure is simple, but the capability to locate and generate reports with respect to plan comments is inadequate

Engineering Contradiction:
Improvelocating and generating reports on plan commentsVSAvoidsystem structure
Core Design Contradiction:
Loss of informationVSDevice complexity

Solution Approach 1:

The system implements feedback mechanisms that automatically track comment locations, associations, and modifications. When comments are added or modified at specific plan coordinates, the system automatically updates the comment database and can generate reports based on this feedback. This automated feedback loop ensures no information is lost while maintaining relatively simple system structure through automatic tracking rather than manual record-keeping.

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The system creates digital copies of comment data associated with specific plan coordinates and metadata. These copied data elements can be independently stored, retrieved, and used to generate reports without affecting the original plan documents. This copying mechanism prevents information loss while keeping the system structure simple by using data replication rather than complex interconnections.

Inventive Principle:
Principle #26Copying

3Adaptability or versatility

If multiple entities need to modify and comment on plans simultaneously, then collaboration capability is improved, but coordination and change tracking become more difficult

Engineering Contradiction:
Improvecollaboration capabilityVSAvoidcoordination and change tracking
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The system acts as an intermediary platform that mediates between multiple entities (architects, design firms, contractors, public agencies). Each entity can add comments and modifications through the same interface, and the system automatically manages the associations between comments and plan coordinates. This intermediary role enables improved collaboration while the system handles the coordination complexity automatically, preventing it from becoming a burden on the users.

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentUS11775750B2Management of building plan documents utilizing comments and a correction list
Publication Date: 2023.10.03 E PLAN INC
  • US11775750B2 patent drawing
  • US11775750B2 patent drawing
  • US11775750B2 patent drawing

AI summary

Systems and methods for managing and processing building plan documents. An electronic building plan document including a plurality of plan sheets is received. A first plan sheet is provided for display. A user interface is provided via which a user can select or enter a first comment associated with the first plan sheet. A user interface is provided via which the user can associate metadata, including a project type or discipline, with the first comment. A first plurality of comments, including the first comment, is stored in association with respective metadata. A user interface via which the user can select, by category and/or subcategory a plurality of comments to be included in a plan correction list, and a correction list is generated including a plurality of comments specified by a plurality of users.