Plan Coordination via Supplier Reliability Recalculation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing plan coordination systems are inefficient in handling alterations to production plans across multiple business operators, as they do not effectively assess the reliability of suppliers and fail to identify alternative suppliers, leading to delays in delivering products when real-time data quality and acquisition frequency are not met, and lack solutions for events that prevent coordination.

Innovation Solution

A plan coordination apparatus that utilizes databases to manage business operators as nodes with reliability indices for order placement/receipt relations, recalculating reliability based on new track records and identifying alternative suppliers by assessing product order placement/receipt relations across the value chain, allowing for swift plan adjustments and notifications.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If existing plan coordination systems are used to handle alterations to production plans, then plan coordination can be performed, but the process is inefficient and delays occur when real-time data quality and acquisition frequency are not met

Engineering Contradiction:
Improveplan coordination efficiencyVSAvoidtime for plan alteration
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The system pre-calculates and stores reliability indices for multiple alternative suppliers before plan alterations are needed. When a plan alteration request occurs, the system can immediately query pre-computed reliability data rather than performing time-consuming real-time assessments, enabling swift identification of alternative suppliers and reducing plan coordination time.

Inventive Principle:
Principle #10Preliminary action

2Reliability

If existing plan coordination systems are used, then coordination between business operators can be achieved, but the systems fail to effectively assess supplier reliability and identify alternative suppliers

Engineering Contradiction:
Improvesupplier reliability assessmentVSAvoidalternative supplier identification
Core Design Contradiction:
ReliabilityVSAdaptability or versatility

Solution Approach 1:

The system performs preliminary assessments of supplier reliability by calculating reliability indices based on historical order placement and receipt track records before actual plan alterations are needed. This pre-computation enables the system to quickly identify alternative suppliers with high reliability indices when original suppliers cannot fulfill plans, improving both reliability assessment effectiveness and alternative supplier identification capability.

Inventive Principle:
Principle #10Preliminary action

3Productivity

If plan alterations are made without reliable alternative supplier identification, then plan changes can be implemented, but product delivery delays occur when original suppliers cannot fulfill plans

Engineering Contradiction:
Improveplan alteration speedVSAvoidproduct delivery timeliness
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The system pre-identifies and ranks alternative suppliers based on their reliability indices calculated from historical track records before plan alterations are needed. When original suppliers cannot fulfill plans, the system can immediately select from pre-qualified alternative suppliers, ensuring both swift plan alterations and reliable product delivery without compromising either speed or delivery timeliness.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS11593733B2Plan coordination apparatus and plan coordination method
Publication Date: 2023.02.28 HITACHI LTD
  • US11593733B2 patent drawing
  • US11593733B2 patent drawing
  • US11593733B2 patent drawing

AI summary

Provided is a plan coordination apparatus that swiftly coordinates plans between business operators regardless of presence or absence of product order placement/receipt-relation. The plan coordination apparatus includes a value chain management unit and a scheduling unit. The value chain management unit prepares value chain data, recalculates reliability of order placement/receipt-relation between the business operators each time a new track record of product order placement/receipt-relation is collected, updates the reliability, and assigns the reliability to the edge. The scheduling unit accepts a plan alteration request from one of the business operators to be managed, refers to automatically adjustable volumes of the product data, the value chain data, and the plan data, judges whether a related business operator can alter the plan, identifies an alternative business operator, gives a notification of the alteration of the plan to the business operator, and alters the plan data.