Downhole Plug Injection Tool for Lost Circulation Zones

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Lost circulation during drilling operations leads to significant time and financial losses due to the inability of existing methods to effectively plug lost circulation zones, as chemicals and cement activation times often exceed the time it takes for them to reach the desired location, resulting in fluid loss into fractures.

Innovation Solution

The use of downhole plug injection tools with axial sealing elements and a fabric strip to hold plugging materials, such as chemicals or cement, in place until they solidify, effectively sealing lost circulation zones by positioning seals above and below the affected area and using flexible ties and fabric to maintain the plugging material within the wellbore.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If chemicals or cement are sent to plug lost circulation zone, then plugging material reaches the fracture zone, but activation or solidification occurs after the material has already been lost into fractures away from wellbore

Engineering Contradiction:
Improveplugging effectivenessVSAvoidactivation time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent applies preliminary action by pre-positioning sealing elements (packers or bridge plugs) at the lost circulation zone before injecting the plugging material. This ensures that when the material is injected, it is immediately contained and can activate or solidify in place without being lost into fractures. The sealing elements are installed in advance to create a containment environment for the subsequent plugging material injection.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent uses an intermediary containment mechanism (sealing elements and fabric strip) between the wellbore and the fracture zone. This intermediary structure prevents direct loss of plugging material into fractures while allowing the material to activate or solidify in the controlled space between the seals, thereby resolving the timing mismatch between material delivery and activation.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Quantity of substance

If conventional methods are used to send chemicals or cement, then material is delivered to lost circulation zone, but material is lost inside fractures away from wellbore before solidification

Engineering Contradiction:
Improveplugging material retentionVSAvoidcement or chemical loss
Core Design Contradiction:
Quantity of substanceVSLoss of substance

Solution Approach 1:

Sealing elements are installed in advance at the lost circulation zone to create a containment barrier before plugging material injection. This preliminary containment prevents material loss into fractures during the injection and activation process, ensuring maximum material retention at the intended plugging location.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent employs a fabric strip as a flexible containment barrier between the sealing elements. This fabric strip acts as a flexible shell that prevents plugging material from escaping into fractures while allowing for some deformation and adaptation to the wellbore geometry, thereby improving material retention without compromising containment effectiveness.

Inventive Principle:
Principle #30Flexible shells and thin films

3Duration of action of stationary object

If activation time is extended to ensure proper solidification, then material solidifies completely, but material reaches fracture zone and is lost before activation completes

Engineering Contradiction:
Improvesolidification durationVSAvoidmaterial transport speed
Core Design Contradiction:
Duration of action of stationary objectVSSpeed

Solution Approach 1:

Sealing elements are pre-installed at the lost circulation zone to create a containment environment before material injection. This preliminary containment allows the material to remain in place during transport and activation, preventing loss into fractures even during the extended solidification period, thereby decoupling the solidification duration from material loss risks.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The sealing elements and fabric strip serve as an intermediary containment system that isolates the plugging material from the fracture zone during the entire activation process. This intermediary barrier allows extended solidification times without material loss, as the containment system prevents transport of material into fractures regardless of activation duration.

Inventive Principle:
Principle #24Intermediary (Mediator)

4Adaptability or versatility

If temperature-triggered reactions are used for chemical activation, then activation can be controlled, but activation may be off and occur at incorrect timing

Engineering Contradiction:
Improveactivation controlVSAvoidactivation timing accuracy
Core Design Contradiction:
Adaptability or versatilityVSMeasurement precision

Solution Approach 1:

The containment system provides feedback control for activation timing by ensuring material remains in place until activation is complete. The sealing elements and fabric strip create a closed system where temperature-triggered reactions can proceed without material loss, allowing for more precise control and monitoring of activation timing based on actual downhole conditions rather than predicted timing alone.

Inventive Principle:
Principle #23Feedback

Data Source

PatentUS11851959B2Method and apparatus for the exact placement of resin and cement plugs
Publication Date: 2023.12.26 SAUDI ARABIAN OIL CO
  • US11851959B2 patent drawing
  • US11851959B2 patent drawing
  • US11851959B2 patent drawing

AI summary

A method of plugging a section of a wellbore wall includes sending a plug injection tool to a downhole location proximate the section of the wellbore wall, setting a first seal below the section of the wellbore wall using the plug injection tool, and setting a second seal above the section of the wellbore wall using the plug injection tool. A plugging material is pumped between the first and second seals and held there until it solidifies.