Problem

Pour over coffee brewing machines using flash boilers deliver hot water intermittently due to the expansion of steam, leading to uneven water flow and compromised organoleptic characteristics of brewed coffee.

Innovation Solution

A sprayhead design with a housing, vented holding chamber, and siphon arrangement that ensures continuous water flow to the brew basket, incorporating a drain to eliminate residual water and provide a pre-infusion pause, optimizing water delivery and temperature consistency.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Speed

If a flash boiler is used to heat water rapidly, then heating speed is improved, but water delivery becomes intermittent and uneven

Engineering Contradiction:
Improveheating speedVSAvoidwater flow continuity
Core Design Contradiction:
SpeedVSStability of the object's composition

Solution Approach 1:

The patent applies preliminary action by pre-heating water in a holding chamber before it reaches the sprayhead. The holding chamber accumulates hot water from the flash boiler and delivers it continuously to the sprayhead, ensuring stable water flow while maintaining the rapid heating capability of the flash boiler.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent uses an intermediary approach by introducing a holding chamber as a buffer between the flash boiler and sprayhead. This intermediary component smooths out the intermittent water delivery from the flash boiler, providing continuous and even water flow to the sprayhead while preserving the rapid heating function.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Ease of operation

If the sprayhead is positioned at greater height than the water inlet, then water delivery to the brew basket is improved, but energy consumption increases

Engineering Contradiction:
Improvewater delivery effectivenessVSAvoidenergy consumption
Core Design Contradiction:
Ease of operationVSUse of energy by moving object

Solution Approach 1:

The patent applies equipotentiality by positioning the holding chamber at a height that allows water to flow into it from the flash boiler outlet without requiring additional pumping energy. The system utilizes the natural pressure differential created by the flash boiler to maintain water flow while keeping the sprayhead at an optimal height for effective water delivery.

Inventive Principle:
Principle #12Equipotentiality

3Power

If water is delivered as intermittent pulses from the flash boiler, then rapid heating is maintained, but coffee brewing quality deteriorates

Engineering Contradiction:
Improveheating powerVSAvoidbrewing quality
Core Design Contradiction:
PowerVSReliability

Solution Approach 1:

The patent implements continuity of useful action by using the holding chamber to accumulate hot water from the flash boiler and deliver it continuously to the sprayhead. This ensures that the brewing process receives a steady, continuous flow of hot water, maintaining high brewing quality while the flash boiler continues to operate at high power for rapid heating.

Inventive Principle:
Principle #20Continuity of useful action

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

The sprayhead delivers hot water in a steady, continuous flow with minimal interruptions, ensuring optimal brewing conditions by preventing residual water cooling and providing a pre-infusion pause for better coffee extraction.

Implementation Method 1

A siphon arrangement connecting the holding chamber with the dispensing chamber, which releases the accumulated quantity of water each time the holding chamber has filled with water

Methodology Applied
Scientific EffectSiphon: Syphon

Implementation Method 2

a flash boiler, also known as a bubble pump, is commonly used. As the water is heated in the flash boiler a two phase mixture of gas phase and liquid phase water is created

Methodology Applied
Scientific EffectHeating: Heating

Implementation Method 3

As the water heats it expands, as steam is generated. This forces the water out of the flash boiler

Methodology Applied
Scientific EffectThermal expansion: Thermal Expansion

Data Source

PatentEP3000361B1A sprayhead for a coffee brewing machine
Publication Date: 2019.04.10 MARCO BEVERAGE SYST LTD
  • EP3000361B1 patent drawingFigure 1~2
  • EP3000361B1 patent drawingFigure 3
  • EP3000361B1 patent drawingFigure 4

AI summary

A sprayhead (10) for a pour over coffee brewing machine for delivering hot water to coffee grounds held in a brew basket therebelow, has a housing (11) with a water inlet (12) at one end thereof, which is connectable to an intermittent source of hot water. A plurality of spaced apart hot water outlets (14) are arranged at the other end (15) of the housing (11). A holding chamber (16) for accumulating a quantity of hot water therein is located within the housing (11) and is connected to the water inlet (12). A dispensing chamber (18) is located within the housing (11) and below the holding chamber (16), in use. A bell siphon (20) located in the holding chamber (16) delivers the accumulated quantity of water from the holding chamber (16) to the dispensing chamber (18), and thence to the coffee grounds, once the water level in the holding chamber (16) rises above an open end (24) of a siphon tube (21). The delivery of the accumulated water by means of the bell siphon 20 converts an intermittent supply of water into a smoother dispensing of hot water from the sprayhead (10).