Power Consumption Evaluation Using Environmental Record Correction

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing power consumption evaluation methods fail to accurately compare periods with and without energy-saving control due to environmental and operational differences, necessitating corrections for accurate energy-saving effect assessments.

Innovation Solution

An evaluation device and program that corrects power consumption records to account for environmental conditions and energy-saving measures, enabling accurate comparison and evaluation from various viewpoints.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If power consumption records are compared directly between periods with and without energy-saving control, then evaluation of energy-saving effects can be performed, but accuracy of comparison deteriorates due to environmental differences such as temperature

Engineering Contradiction:
Improveaccuracy of power consumption comparisonVSAvoidenvironmental differences affecting comparison
Core Design Contradiction:
Measurement precisionVSObject-affected harmful factors

Solution Approach 1:

The patent applies parameter changes by correcting power consumption records based on environmental parameters (temperature, humidity) to enable accurate comparison. The system calculates corrected power consumption values that account for environmental variations, allowing fair comparison between periods with different environmental conditions.

Inventive Principle:
Principle #35Parameter changes

Solution Approach 2:

The patent introduces an intermediary correction mechanism that mediates between raw power consumption records and comparable values. The correction unit acts as an intermediary that processes raw records through environmental factor analysis to produce corrected records suitable for accurate comparison.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Measurement precision

If multiple types of corrections are applied to power consumption records, then evaluation accuracy from various viewpoints is improved, but device complexity increases

Engineering Contradiction:
Improveevaluation accuracyVSAvoidcorrection system complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The patent applies segmentation by dividing the correction process into distinct functional units: a correction unit that performs environmental condition correction and an energy-saving correction unit that handles energy-saving measure corrections. This segmentation allows multiple correction types to be applied systematically while maintaining manageable system complexity.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The patent implements dynamics by allowing flexible selection and combination of different correction types based on evaluation needs. The system can dynamically apply environmental condition correction, energy-saving correction, or both, depending on the specific evaluation purpose, making the system adaptable without requiring all correction mechanisms to be permanently active.

Inventive Principle:
Principle #15Dynamics

Data Source

PatentUS12585318B2Evaluation device and program
Publication Date: 2026.03.24 DAIKIN INDUSTRIES LTD
  • US12585318B2 patent drawing
  • US12585318B2 patent drawing
  • US12585318B2 patent drawing

AI summary

[Object] To correct a power consumption record in a period in which energy-saving control is performed and a power consumption record in a period in which the energy-saving control is not performed in accordance with a purpose of the comparison, and to enable evaluation of power consumption from various viewpoints.[Solution] A terminal device configured to evaluate power consumption of equipment includes a communication control unit configured to acquire a power consumption record of the equipment, and a processing unit configured to output data related to power consumption records before and after an energy-saving operation of the equipment. The processing unit performs correction I and correction II (II′) to make one of a power consumption period in an operation period before the energy-saving operation and a power consumption record in an operation period after the energy-saving operation comparable with the power consumption record in the other operation period, and then outputs data related to the power consumption records before and after the energy-saving operation.