Power Control Unit Distinguishes First Power-On to Reduce Startup Time

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing electrical devices face inefficiencies when power is switched on and off by software, leading to repeated unnecessary processing and prolonged startup times due to displacement of internal mechanisms and changes in usage environments.

Innovation Solution

An electrical device comprising a controlling unit, a power supplying unit, and a power controlling unit that distinguishes between the first power-on after a hard-on and subsequent power-ons, thereby executing different processing to prevent unnecessary initialization and calibration.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If processing related to preparation for use is performed each time the power is turned on, then the device ensures proper initialization, but unnecessary processing is repeatedly executed and startup time increases

Engineering Contradiction:
Improveinitialization completenessVSAvoidstartup time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The system performs initialization processing only when necessary (first power-on after power supply connection or power recovery), and stores the execution status. Subsequent power-on operations skip the initialization by checking this stored status, thereby avoiding unnecessary repeated processing while ensuring proper initialization when needed.

Inventive Principle:
Principle #10Preliminary action

2Ease of operation

If the power is switched on and off by software in response to power key operations, then power management is achieved, but processing related to preparation for use may be unnecessarily repeated

Engineering Contradiction:
Improvepower managementVSAvoidoperational efficiency
Core Design Contradiction:
Ease of operationVSProductivity

Solution Approach 1:

The system uses a flag storage mechanism to record whether initialization processing has been executed. When power is turned on, the system checks this flag to determine whether to perform initialization again. This feedback mechanism prevents unnecessary repeated processing while maintaining proper power management functionality.

Inventive Principle:
Principle #23Feedback

3Reliability

If initialization processing is executed every power-on, then device readiness is ensured, but unnecessary processing occurs during software power cycling

Engineering Contradiction:
Improvedevice readinessVSAvoidprocessing logic
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The system performs initialization processing only when necessary (first power-on after power supply connection or power recovery), and stores the execution status. Subsequent power-on operations skip the initialization by checking this stored status, thereby avoiding unnecessary repeated processing while ensuring proper initialization when needed.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system automatically determines whether initialization is needed by checking the stored flag status, without requiring user intervention or complex external judgment. This self-service approach simplifies the control logic while ensuring device readiness.

Inventive Principle:
Principle #25Self-service

Data Source

PatentUS20250200316A1Electrical device
Publication Date: 2025.06.19 CANON KK
  • US20250200316A1 patent drawing
  • US20250200316A1 patent drawing
  • US20250200316A1 patent drawing

AI summary

An electrical device includes a controlling unit configured to control the electrical device, a power supplying unit configured to supply power to the controlling unit, and a power controlling unit configured to control supply and interruption of power with regard to the controlling unit by the power supplying unit. In a case where the controlling unit receives a supply of power from the power supplying unit under control of the power controlling unit, the controlling unit executes different processing based on whether or not the supply of power is a first supply of power after power-on with regard to the power supplying unit.