Power Management Server for Flexible Grid Frequency Adjustment

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing power management systems for virtual power plants have limited flexibility in supply and demand adjustments due to fixed fluctuation cycles, which can hinder effective frequency adjustments in power grids.

Innovation Solution

A power management server that receives adjustment requests from an upper management server, manages correspondence relationships between fluctuation cycles and adjustment power supplies, and determines appropriate power supplies to transmit adjustment instructions based on these relationships, allowing for more flexible and precise frequency adjustments in power grids.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Device complexity

If adjustment power supplies are divided into categories with fixed fluctuation cycles, then the system structure becomes simpler and easier to manage, but the degree of freedom of supply and demand adjustment is reduced

Engineering Contradiction:
Improvesystem structureVSAvoiddegree of freedom of supply and demand adjustment
Core Design Contradiction:
Device complexityVSAdaptability or versatility

Solution Approach 1:

The patent applies dynamics by transitioning from fixed fluctuation cycles to flexible fluctuation cycles. The management server dynamically determines fluctuation cycles based on power supply/demand conditions, allowing the system to adapt to changing grid conditions. This enables the system to maintain simplicity while gaining flexibility in supply and demand adjustments.

Inventive Principle:
Principle #15Dynamics

2Ease of operation

If fixed fluctuation cycles are used for each category of adjustment power supply, then control instructions are easier to transmit, but the frequency adjustment capability is insufficient

Engineering Contradiction:
Improvecontrol instruction transmissionVSAvoidfrequency adjustment capability
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

The patent changes the parameter of fluctuation cycle from fixed to flexible. The management server determines appropriate fluctuation cycles based on current power supply/demand conditions, allowing the system to maintain ease of operation while improving frequency adjustment capability. The server transmits control instructions with dynamically adjusted timing parameters to achieve better grid frequency control.

Inventive Principle:
Principle #35Parameter changes

3Stability of the object's composition

If adjustment instructions are transmitted according to fixed fluctuation cycles, then the control system is more stable, but the response to power grid frequency fluctuations is delayed

Engineering Contradiction:
Improvecontrol system stabilityVSAvoidresponse speed to frequency fluctuations
Core Design Contradiction:
Stability of the object's compositionVSSpeed

Solution Approach 1:

The patent implements dynamic fluctuation cycles that adapt to grid conditions. When frequency deviations occur, the management server adjusts the fluctuation cycle to enable faster response. This maintains control system stability through structured management while improving response speed when needed, resolving the contradiction between stability and responsiveness.

Inventive Principle:
Principle #15Dynamics

Data Source

PatentUS11881711B2Power management server and power management method
Publication Date: 2024.01.23 KYOCERA CORP
  • US11881711B2 patent drawing
  • US11881711B2 patent drawing
  • US11881711B2 patent drawing

AI summary

A power management server includes a receiver for receiving, from an upper management server, an adjustment request for requesting a fluctuation adjustment of a frequency of a power grid for each fluctuation cycle of an adjustment target, a transmitter for transmitting, to an adjustment power supply, an adjustment instruction for instructing the fluctuation adjustment of the frequency of the power grid according to the fluctuation cycle of the adjustment target requested by the adjustment request, a management unit for managing a correspondence relationship between the fluctuation cycle of the adjustment target instructed by the adjustment instruction and the adjustment power supply, and a controller for determining an adjustment power supply to which the adjustment instruction is to be transmitted based on the correspondence relationship.