Power Simulation Integration via Time Synchronization

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current systems lack an efficient method to integrate power production simulation with power distribution simulation, leading to inefficiencies in modeling and validation of power production and distribution systems.

Innovation Solution

A system that provides time synchronization and data exchange between power production modeling and simulation systems (PPMSS) and power distribution modeling and simulation systems (PDMSS) using a simulation integration system, allowing for shared memory exchanges and inter-process communication techniques, enabling the PPMSS to control the execution of the PDMSS with a higher frequency until synchronization with the PPMSS integration time step.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If power production simulation and power distribution simulation are integrated using shared memory and inter-process communication, then simulation fidelity and efficiency are improved, but system complexity increases

Engineering Contradiction:
Improvesimulation fidelityVSAvoidsystem complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The patent employs shared memory as an intermediary mechanism between the power production simulation system and power distribution simulation system. This shared memory space enables efficient data exchange and synchronization without requiring direct complex inter-process communication protocols, thus improving simulation fidelity while managing system complexity through a standardized intermediate interface.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Productivity

If PDMSS runs at higher frequency than PPMSS integration time step, then simulation efficiency is improved, but time synchronization difficulty increases

Engineering Contradiction:
Improvesimulation efficiencyVSAvoidtime synchronization difficulty
Core Design Contradiction:
ProductivityVSDifficulty of detecting and measuring

Solution Approach 1:

The patent implements periodic synchronization where the PDMSS runs at a higher frequency but synchronizes its state variables with the PPMSS at regular intervals matching the PPMSS integration time step. This periodic alignment ensures time synchronization accuracy while allowing the PDMSS to operate efficiently at higher frequencies between synchronization points, improving overall simulation efficiency.

Inventive Principle:
Principle #19Periodic action

3Device complexity

If specialized hardware like reflective memory is avoided, then device complexity is reduced, but data exchange reliability may worsen

Engineering Contradiction:
Improvehardware requirementsVSAvoiddata exchange reliability
Core Design Contradiction:
Device complexityVSReliability

Solution Approach 1:

The patent uses software-based shared memory that creates virtual copies of data structures in a common address space accessible by both simulation systems. This copying mechanism eliminates the need for specialized hardware like reflective memory while maintaining data exchange reliability through consistent memory access protocols and synchronization mechanisms implemented in software.

Inventive Principle:
Principle #26Copying

Data Source

PatentUS10372847B2Systems and methods to integrate power production simulation with power distribution simulation
Publication Date: 2019.08.06 GE INFRASTRUCTURE TECH LLC
  • US10372847B2 patent drawing
  • US10372847B2 patent drawing
  • US10372847B2 patent drawing

AI summary

In one embodiment, a system includes a processor. The processor is configured to provide for time synchronization between execution of a power production modeling and simulation system (PPMSS) model and a power distribution modeling and simulation system (PDMSS) model, wherein the PPMSS model comprises a power production system simulation and wherein the PDMSS model comprises a power distribution system simulation.