Power Storage Device Update Path Sharing for Miniaturization

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional methods for updating control programs in electronic equipment require disassembly and expose connectors, limiting miniaturization and increasing labor, as the update process is infrequent and labor-intensive, and the number of pins on connectors increases, making miniaturization difficult.

Innovation Solution

A power storage device with a sensor, control device, and transmission/reception path that allows for updating the control program without disassembly by sharing paths for detection results and program updates, using a switch to control the update process based on user input, and integrating a processing unit for component control and communication.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If a connector for updating is installed in electronic equipment, then the labor of disassembling is saved, but the number of pins of the connector increases and miniaturization becomes impossible

Engineering Contradiction:
Improveease of updateVSAvoidnumber of pins
Core Design Contradiction:
Ease of operationVSDevice complexity

Solution Approach 1:

The existing connector for power supply is made to serve dual purposes: both power transmission and control program update. The update function is achieved by utilizing the existing communication capability between the power storage device and external equipment, eliminating the need for a separate update connector.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The function of power supply and control program update is merged into a single communication interface. The transmission/reception path that originally handled only power and basic communication now also handles control program transmission, combining multiple functions into one pathway.

Inventive Principle:
Principle #5Merging (Combining)

2Ease of manufacture

If disassembly is performed to update control program, then update can be performed, but labor and time are required and update timing is limited

Engineering Contradiction:
Improveupdate capabilityVSAvoidupdate time
Core Design Contradiction:
Ease of manufactureVSLoss of time

Solution Approach 1:

The power storage device autonomously performs control program updates by receiving update programs from external equipment through its existing communication interface. The device independently manages the update process, including determining update necessity based on version information and executing the update without requiring user disassembly actions.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The control program is updated in advance during manufacturing or maintenance periods when the device is already connected to external equipment. This preliminary updating ensures the device has the latest control programs before actual use, eliminating the need for user-initiated disassembly updates.

Inventive Principle:
Principle #10Preliminary action

3Adaptability or versatility

If a separate connector for update is provided, then update function is achieved, but the number of components increases and miniaturization is hindered

Engineering Contradiction:
Improveupdate functionVSAvoiddevice size
Core Design Contradiction:
Adaptability or versatilityVSVolume of moving object

Solution Approach 1:

The existing communication interface in the power storage device is made universal to handle both power management and control program update functions. This eliminates the need for separate update connectors and reduces the overall device volume.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The update function is extracted from the physical connector domain and implemented through software-based communication protocols over the existing communication interface. This removes the need for additional physical components dedicated to updating.

Inventive Principle:
Principle #2Taking out (Extraction)

Data Source

PatentEP4033634A1Power storage device and electronic equipment
Publication Date: 2022.07.27 FDK CORP
  • EP4033634A1 patent drawingFigure 1
  • EP4033634A1 patent drawingFigure 2
  • EP4033634A1 patent drawingFigure 3

AI summary

A transmission/reception path PA is configured to transmit a detection result sent from a sensor 22 to a control device 23 and external equipment 3 connected to a connection terminal Ts1, and transmit a program for update transmitted from the external equipment to the control device via the connection terminal, and the control device can further perform update for updating a control program stored in a storage unit to the program for update transmitted from the external equipment via the connection terminal and the transmission/reception path.