Pre-Insulated Pipe Fasteners for Noise Reduction

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing plumbing arrangements with pre-insulated pipe sections are cumbersome, time-consuming, and costly to install, especially in tight spaces, and struggle to manage installation tolerances and reduce structure-borne noise.

Innovation Solution

A plumbing arrangement featuring pre-insulated pipe sections with fasteners made of rigid materials, such as metal or rigid plastics, that are fixedly connected to the insulation layer, allowing for easier on-site installation and noise reduction, using methods like embedding, adhesive bonding, or double-sided tape, and incorporating push fittings and extension insulation sections for continuous vertical plumbing lines.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If separate individual fasteners are installed on-site, then the pre-insulated pipe section can be connected to another structure, but the installation becomes cumbersome, time-consuming and costly

Engineering Contradiction:
Improveinstallation easeVSAvoidinstallation time
Core Design Contradiction:
Ease of operationVSLoss of time

Solution Approach 1:

The fastener is merged with the insulation layer to form an integrated component. The fastener is embedded in the insulation layer during manufacturing, eliminating the need for separate installation steps and reducing on-site assembly complexity

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The fastener is pre-installed and embedded in the insulation layer during factory manufacturing before the pipe section is shipped to the site. This preliminary action eliminates time-consuming on-site fastener installation and positioning work

Inventive Principle:
Principle #10Preliminary action

2Manufacturing precision

If separate individual fasteners are installed on-site, then the pre-insulated pipe section can be connected to another structure, but installation tolerances become difficult to manage in tight spaces

Engineering Contradiction:
Improveinstallation toleranceVSAvoidinstallation complexity
Core Design Contradiction:
Manufacturing precisionVSDevice complexity

Solution Approach 1:

The fastener and insulation layer are combined into a single integrated component with predetermined geometric relationships. This merging ensures precise positioning and eliminates tolerance accumulation issues that occur when assembling separate components in tight spaces

Inventive Principle:
Principle #5Merging (Combining)

3Object-affected harmful factors

If conventional fasteners are used, then the pre-insulated pipe section can be connected to another structure, but structure-borne noise from the pipe to the structure cannot be prevented

Engineering Contradiction:
Improvenoise transmissionVSAvoidconnection strength
Core Design Contradiction:
Object-affected harmful factorsVSStrength

Solution Approach 1:

The fastener is constructed as a composite structure with a rigid baseplate for mechanical strength and a resilient fastening member for noise isolation. This composite design allows the fastener to simultaneously provide strong structural connection and acoustic damping to prevent structure-borne noise transmission

Inventive Principle:
Principle #40Composite materials

4Ease of manufacture

If multiple separate parts are used for fasteners, then the connection can be achieved, but the number of parts is reduced in the invention

Engineering Contradiction:
Improvemanufacturing simplicityVSAvoidfastener parts
Core Design Contradiction:
Ease of manufactureVSDevice complexity

Solution Approach 1:

Multiple fastener components (baseplate, fastening member, and insulation layer) are merged into an integrated assembly where the fastening member is embedded in the insulation layer during molding. This reduces the number of separate parts that need to be handled and assembled on-site

Inventive Principle:
Principle #5Merging (Combining)

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

Facilitates quick and cost-effective installation of pre-insulated pipe sections with reduced parts, improved noise isolation, and precise positioning, suitable for prefabricated modules in multi-story buildings, while maintaining thermal insulation efficiency.

Implementation Method 1

the fastening member is made resilient and is arranged to reduce structure-borne noise from the pipe to the structure to which the pre-insulated pipe section is connected by the fasteners

Methodology Applied
Scientific EffectVibration damping: Damping

Implementation Method 2

the fastener is bonded with an adhesive on the outer surface of the insulation layer

Methodology Applied
Scientific EffectAdhesive bonding: Adhesive

Implementation Method 3

the fasteners are bonded with a double sided tape on the outer surface of the insulation layer

Methodology Applied
Scientific EffectAdhesive bonding: Adhesive

Data Source

PatentUS10865932B2Plumbing arrangement
Publication Date: 2020.12.15 UPONOR INNOVATION AB
  • US10865932B2 patent drawing
  • US10865932B2 patent drawing
  • US10865932B2 patent drawing

AI summary

A plumbing arrangement having a pre-insulated pipe section. The pre-insulated pipe section includes a pipe and a thermal insulation layer of rigid foam molded to surround the pipe. The pre-insulated pipe section having fasteners made of rigid material fixedly connected to the insulation layer as integral parts for connecting the pre-insulated pipe section to another structure.