Problem

Conventional building wall construction methods face challenges in managing moisture and ensuring ideal concrete curing conditions, leading to potential voids and reduced strength in vertical concrete pours.

Innovation Solution

A pre-fabricated rain screen wall panel design featuring inner and outer concrete panels, an intermediate drainage panel with channels for water evacuation, insulation, a vapor barrier, and shear connectors to secure the panels together, allowing for factory assembly and installation on standard foundations.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of manufacture

If concrete is poured vertically into a mould at the building site, then the wall structure can be formed on-site, but voids are created in the concrete reducing its strength

Engineering Contradiction:
Improveon-site construction flexibilityVSAvoidconcrete strength
Core Design Contradiction:
Ease of manufactureVSStrength

Solution Approach 1:

The wall panel is divided into multiple horizontal layers of concrete that are cast sequentially in a horizontal mould. This segmentation allows each layer to be poured and cured properly without creating voids, while still enabling on-site assembly of the complete wall panel.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The concrete layers are cast and cured in advance in a controlled factory environment before installation at the building site. This preliminary action ensures ideal curing conditions and eliminates voids, while the pre-fabricated panel can still be installed on-site to complete the wall construction.

Inventive Principle:
Principle #10Preliminary action

2Ease of manufacture

If wall panels are assembled at the building site, then construction can proceed with standard materials, but moisture management becomes difficult and concrete curing conditions are not ideal

Engineering Contradiction:
Improvestandard construction materialsVSAvoidmoisture management and curing quality
Core Design Contradiction:
Ease of manufactureVSReliability

Solution Approach 1:

The concrete panels are cast and cured in a controlled factory environment before installation. This preliminary action ensures ideal curing conditions and proper moisture management during the critical concrete setting process, eliminating the problems of on-site moisture control while using standard construction materials.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

An intermediate drainage panel is introduced between the inner and outer concrete panels. This intermediary component provides dedicated moisture management and drainage functionality, separating the moisture control function from the structural concrete panels and enabling reliable performance.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Strength

If pre-fabricated panels are manufactured in a factory, then concrete can cure under ideal conditions and voids are reduced, but the panel design becomes more complex with multiple intermediate layers

Engineering Contradiction:
Improveconcrete strengthVSAvoidpanel structure complexity
Core Design Contradiction:
StrengthVSDevice complexity

Solution Approach 1:

The wall panel is segmented into distinct functional layers: inner concrete panel, intermediate drainage panel, intermediate insulation panel, and outer concrete panel. Each layer performs a specific function, and the segmentation allows for simplified manufacturing of each component in the factory before assembly.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The intermediate drainage panel serves multiple functions: it provides moisture management, structural support, and a form for the rain channels. This multi-functionality reduces the need for separate components and simplifies the overall design despite the increased number of layers.

Inventive Principle:
Principle #6Universality (Multi-functionality)

4Object-affected harmful factors

If drainage channels are added to the intermediate panel, then water evacuation is improved, but the panel structure becomes more complex

Engineering Contradiction:
Improvewater accumulationVSAvoiddrainage system complexity
Core Design Contradiction:
Object-affected harmful factorsVSDevice complexity

Solution Approach 1:

The drainage channels are merged directly into the intermediate drainage panel as an integrated feature rather than separate components. This combining of the drainage function with the structural panel simplifies the overall system while effectively managing water evacuation through the channel network.

Inventive Principle:
Principle #5Merging (Combining)

Data Source

PatentUS9010050B2Pre-cast rain screen wall panel
Publication Date: 2015.04.21 HATZINIKOLAS MICHAEL
  • US9010050B2 patent drawing
  • US9010050B2 patent drawing
  • US9010050B2 patent drawing

AI summary

A prefabricated rain screen wall panel is provided comprising inner and outer concrete panels secured together by shear connectors. Intermediate members provide insulation, a drainage channel and a vapor barrier.