Pre-configured Measurement Gap Testing Procedure

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current wireless communication testing procedures are inefficient as they require separate test cases for pre-configured measurement gap (pre-MG) activation/deactivation and intra-frequency measurement with gap, leading to increased complexity and time.

Innovation Solution

A testing procedure that combines the evaluation of pre-MG activation/deactivation delay and measurement reporting into three successive time periods, allowing for the simultaneous testing of pre-MG core requirements.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If separate test cases are used for pre-MG activation/deactivation and intra-frequency measurement with gap, then each test case can be designed independently, but the number of test cases increases and testing complexity increases

Engineering Contradiction:
Improvetest case design flexibilityVSAvoidtesting procedure complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The patent combines pre-MG activation/deactivation testing and intra-frequency measurement testing into a single integrated test case. The test procedure simultaneously evaluates both the activation/deactivation delay performance and the measurement reporting with gap requirements by configuring the UE to perform measurements during pre-MG active periods while tracking activation timing, thereby reducing the total number of test cases without sacrificing either test's measurement precision or adaptability

Inventive Principle:
Principle #5Merging (Combining)

2Reliability

If separate test cases are used for pre-MG activation/deactivation and intra-frequency measurement with gap, then each function can be tested thoroughly, but the testing time increases

Engineering Contradiction:
Improvefunctionality verification thoroughnessVSAvoidtesting duration
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent merges two separate testing sequences into one concurrent test execution. The test procedure defines three time periods where the UE is configured to measure reference signals during pre-MG active periods while the network controls activation timing. This allows both activation/deactivation delay verification and measurement reporting verification to occur simultaneously, reducing total testing time while maintaining thorough verification of both functions through coordinated timing control and measurement collection

Inventive Principle:
Principle #5Merging (Combining)

3Measurement precision

If multiple separate test cases are used, then detailed evaluation of each requirement is possible, but the testing process becomes more complex and time-consuming

Engineering Contradiction:
Improverequirement evaluation accuracyVSAvoidtesting efficiency
Core Design Contradiction:
Measurement precisionVSProductivity

Solution Approach 1:

The patent combines multiple requirement evaluations into a single test case that measures both activation/deactivation delay and measurement reporting performance simultaneously. The test procedure uses coordinated timing control where the network activates/deactivates pre-MG at specific moments and the UE reports measurements at defined intervals, allowing precise measurement of both requirements through one integrated procedure that improves testing efficiency without sacrificing measurement precision

Inventive Principle:
Principle #5Merging (Combining)

Data Source

PatentUS20250142375A1Pre-configured measurement gap (MG) testing procedure
Publication Date: 2025.05.01 INTEL CORP
  • US20250142375A1 patent drawing
  • US20250142375A1 patent drawing
  • US20250142375A1 patent drawing

AI summary

Various embodiments herein provide techniques related to measurements in a testing scenario by a user equipment (UE) that is configured to use a pre-configured measurement gap (pre-MG). In embodiments, the UE may be configured to perform one or more measurements with the pre-MG disabled. The pre-MG may then be enabled and the UE may perform additional measurements. In this way, a plurality of parameters related to the UE and/or the pre-MG may be identified based on the testing scenario. Other embodiments may be described and/or claimed.