Problem

Datacenter administrators face challenges in accurate capacity planning due to predictive inaccuracies and frequent updates, as they need to balance resource demands, obsolescence, and cost considerations when planning for host machine replacements and growth.

Innovation Solution

A system that generates personalized purchase plans for replacing host machines based on historical usage data, future demand projections, and benchmark data, using a recommendation engine to identify necessary resources and vendors, thereby optimizing capacity planning and reducing the frequency of updates.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If administrators use periodic purchase cycles (e.g., yearly) to add hosts to the datacenter, then the purchasing process is simple and predictable, but the capacity planning becomes inaccurate and requires frequent updates

Engineering Contradiction:
Improvepurchasing process simplicityVSAvoidcapacity planning accuracy
Core Design Contradiction:
Ease of operationVSMeasurement precision

Solution Approach 1:

The system performs preliminary actions by generating predictive capacity planning recommendations in advance using historical data and machine learning models. This allows administrators to plan host additions and replacements before they are needed, eliminating the need for frequent updates while maintaining high accuracy. The predictive model proactively analyzes trends and generates forecasts that remain valid across multiple planning cycles.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system incorporates feedback mechanisms by continuously analyzing actual workload performance against predicted capacity requirements. This feedback loop allows the machine learning model to refine its predictions over time, improving accuracy without requiring frequent manual recalibration. The system learns from actual usage patterns and adjusts future predictions accordingly.

Inventive Principle:
Principle #23Feedback

2Measurement precision

If administrators frequently update capacity plans to account for growth and obsolescence, then the capacity planning remains accurate, but the administrative workload and time consumption increase

Engineering Contradiction:
Improvecapacity planning accuracyVSAvoidadministrative time for updates
Core Design Contradiction:
Measurement precisionVSLoss of time

Solution Approach 1:

The system performs self-service by automatically generating and updating capacity planning recommendations using machine learning models that continuously learn from historical data. This eliminates the need for administrators to manually perform frequent updates. The system autonomously analyzes workload trends, predicts future capacity requirements, and generates purchase recommendations without human intervention.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The system replaces the mechanical manual update process with an automated machine learning-based predictive system. Instead of administrators manually analyzing and updating capacity plans frequently, the system uses algorithms to automatically generate predictions based on historical patterns, substituting human analytical work with computational processes that operate continuously and accurately.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

3Device complexity

If administrators manually calculate resource requirements based on current capacity and workloads, then the planning process is straightforward, but the predictions become inaccurate and misleading

Engineering Contradiction:
Improveplanning process simplicityVSAvoidresource requirement prediction accuracy
Core Design Contradiction:
Device complexityVSMeasurement precision

Solution Approach 1:

The system changes the parameters used for capacity planning from simple current-state metrics to complex predictive models that incorporate historical trends, seasonal patterns, and machine learning analyses. This transformation of parameters allows the system to maintain planning simplicity while dramatically improving prediction accuracy through sophisticated data-driven approaches.

Inventive Principle:
Principle #35Parameter changes

Solution Approach 2:

The system introduces an intermediary layer in the form of machine learning models that mediate between raw historical data and capacity planning recommendations. This intermediary processing layer transforms complex historical patterns into actionable predictions, bridging the gap between data availability and planning accuracy without requiring administrators to manually process complex analyses.

Inventive Principle:
Principle #24Intermediary (Mediator)

4Duration of action of stationary object

If administrators plan for host replacement based on end-of-life cycles, then the purchasing timeline is predictable, but the capacity to handle growth and obsolescence simultaneously becomes insufficient

Engineering Contradiction:
Improvehost lifecycle durationVSAvoidcapacity to handle growth and obsolescence
Core Design Contradiction:
Duration of action of stationary objectVSAdaptability or versatility

Solution Approach 1:

The system introduces dynamics to the static end-of-life replacement cycle by using predictive models that continuously adapt to changing workload patterns, growth rates, and hardware obsolescence trends. This dynamic approach allows the capacity planning to respond to real-time conditions while maintaining the structured replacement timeline, balancing predictability with adaptability.

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The system performs preliminary analysis of both replacement needs and growth requirements using historical data and predictive modeling. This allows the system to proactively identify which hosts need replacement and where capacity growth is needed, enabling simultaneous handling of both obsolescence and growth scenarios before they arise.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS11429455B2Generating predictions for host machine deployments
Publication Date: 2022.08.30 VMWARE INC
  • US11429455B2 patent drawing
  • US11429455B2 patent drawing
  • US11429455B2 patent drawing

AI summary

Disclosed are various embodiments for generating recommended replacement host machines for a datacenter. The recommendations can be generated based upon an analysis of historical workload usage across the datacenter. Clusters can be generated that cluster workloads together that are similar. Purchase plans can be generated based upon the identified clusters and benchmark data regarding servers.