Directed Predictive Simulation for Process Control Sequence Stalls

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Traditional process control systems in industrial plants often fail to predict and prevent sequence stalls, leading to manufacturing delays, lost production, and equipment damage due to unforeseen abnormal situations, as operators are not alerted until the situation occurs, and existing simulation systems lack synchronization with actual plant operations.

Innovation Solution

A real-time control system with a look-ahead simulation feature that executes a simulation in parallel with actual plant operations, predicting future steps and potential stalls by initializing from the current plant state and running faster than real-time to detect and notify operators of impending issues before they occur.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If traditional process control systems are used without look-ahead simulation, then the control system operates in real-time with current data, but operators are not alerted until abnormal situations occur, leading to sequence stalls and production loss

Engineering Contradiction:
Improveprediction accuracyVSAvoidresponse time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The system performs preliminary simulation of future process steps before they actually occur. The look-ahead simulation predicts potential sequence stalls and abnormal situations in advance, allowing operators to take preventive action before problems manifest in the actual process, thereby resolving the contradiction between prediction accuracy and response time.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The control system is divided into two parallel operational modes: real-time control for current operations and look-ahead simulation for future predictions. This segmentation allows the system to maintain real-time responsiveness while simultaneously performing predictive analysis, resolving the time response contradiction by separating these functions into distinct operational segments.

Inventive Principle:
Principle #1Segmentation

2Productivity

If simulation systems are run separately from actual plant operations, then simulation can be performed without affecting real-time control, but synchronization with actual plant operations is lost, reducing prediction accuracy

Engineering Contradiction:
Improvesimulation speedVSAvoidsynchronization accuracy
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The look-ahead simulation system is merged with the real-time control system through shared data architecture and synchronized timing. The simulation uses actual process data from the control system and feeds predictions back to operators, creating an integrated system that maintains both simulation speed and synchronization accuracy simultaneously.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

A data interface layer acts as an intermediary between the real-time control system and the look-ahead simulation. This intermediary enables efficient data exchange while maintaining synchronization, allowing the simulation to run at high speed using current process data without disrupting real-time control operations, thus resolving the contradiction between productivity and reliability.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Ease of operation

If operators are notified only when abnormal situations occur, then the control system remains simple and responsive, but sequence stalls cause manufacturing delays and lost production

Engineering Contradiction:
Improveoperator alertnessVSAvoidmanufacturing efficiency
Core Design Contradiction:
Ease of operationVSProductivity

Solution Approach 1:

The look-ahead simulation provides continuous feedback to operators about potential future problems. By predicting sequence stalls before they occur and presenting this information to operators in an intuitive format, the system enhances operator awareness and enables proactive decision-making, resolving the contradiction between ease of operation and manufacturing efficiency.

Inventive Principle:
Principle #23Feedback

Data Source

PatentUS11604459B2Real-time control using directed predictive simulation within a control system of a process plant
Publication Date: 2023.03.14 EMERSON PROCESS MANAGEMENT POWER & WATER SOLUTIONS INC
  • US11604459B2 patent drawing
  • US11604459B2 patent drawing
  • US11604459B2 patent drawing

AI summary

A real-time control system includes a simulation system to implement a predictive, look-ahead function that provides an operator with information that enables a higher level of situational awareness of the expected transitional events of future steps within the control program or sequence logic. The simulation system enables future steps and transitions to be monitored before they actually occur, which enables the operator to recognize and potentially take action, in a current time step, to alleviate the underlying cause of the problem, thus reducing the likelihood of or preventing a sequence stall of the control program.