Prefabricated Element Grid Structure for Modular Housing Assembly

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing prefabricated housing units lack stability, aesthetic, and functional features such as fire resistance and flexibility in design, limiting their use in unique constructions and requiring extensive and costly extensions.

Innovation Solution

A prefabricated element made of composite construction material with crushed aggregates agglomerated by high-performance concrete, featuring a grid structure for insulation, reinforced mechanical properties, and modular design allowing for easy assembly and customization, including integrated sealing and load distribution systems.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If standardization is applied to reduce manufacturing costs, then productivity improves, but adaptability deteriorates

Engineering Contradiction:
Improvemanufacturing efficiencyVSAvoiddesign flexibility
Core Design Contradiction:
ProductivityVSAdaptability or versatility

Solution Approach 1:

The housing unit is divided into multiple modular prefabricated elements that can be standardized in production yet assembled in various configurations. Each element contains standardized components (flanges, ribs, partition walls) that maintain manufacturing efficiency while allowing flexible arrangement to create unique designs.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The prefabricated elements are designed with universal features including standardized flanges for assembly, integrated insulation systems, and multi-purpose structural components that can serve different functions depending on the configuration, enabling both standardization and adaptability.

Inventive Principle:
Principle #6Universality (Multi-functionality)

2Ease of manufacture

If modular units with reduced surface area are used, then ease of manufacture improves, but area of housing unit deteriorates

Engineering Contradiction:
Improveprefabrication efficiencyVSAvoidhousing area
Core Design Contradiction:
Ease of manufactureVSArea of stationary object

Solution Approach 1:

The patent transitions from two-dimensional modular panels to three-dimensional prefabricated elements with integrated partition walls, flanges, and insulation. This vertical integration allows greater housing volume and area within each manufactured unit, expanding living space while maintaining ease of prefabrication.

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

3Ease of manufacture

If known concrete construction panels are used, then ease of manufacture improves, but reliability deteriorates due to lack of tightness and mechanical reinforcement

Engineering Contradiction:
Improvepanel productionVSAvoidstructural integrity and tightness
Core Design Contradiction:
Ease of manufactureVSReliability

Solution Approach 1:

The panel integrates multiple materials and functions: concrete construction material for structure, insulating materials for thermal insulation, sealing elements for tightness, and reinforcement features for mechanical strength. This composite approach maintains manufacturing simplicity while significantly improving reliability.

Inventive Principle:
Principle #40Composite materials

Solution Approach 2:

The patent combines previously separate components (structural panel, insulation, sealing elements, reinforcement) into a single integrated prefabricated element. This merging ensures proper integration of tightness and mechanical reinforcement features that would be difficult to achieve with separate components, while maintaining ease of manufacture through monolithic production.

Inventive Principle:
Principle #5Merging (Combining)

4Adaptability or versatility

If extensive extensions are made to existing modular units, then adaptability improves, but loss of time and cost increase

Engineering Contradiction:
Improvedesign customizationVSAvoidassembly time
Core Design Contradiction:
Adaptability or versatilityVSLoss of time

Solution Approach 1:

The prefabricated elements are designed with pre-integrated features including insulation, sealing elements, and assembly connections during manufacturing. This preliminary action eliminates the need for time-consuming on-site extensions and modifications, allowing rapid assembly of customized housing configurations directly from standardized components.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentEP2242888B1Prefabricated element for a habitation unit
Publication Date: 2014.03.05 DAMICHEY DAVID
  • EP2242888B1 patent drawingFigure 1
  • EP2242888B1 patent drawingFigure 2
  • EP2242888B1 patent drawingFigure 3

AI summary

This invention relates to a prefabricated element (1) for a dwelling unit that is notable in that it comprises: a vertical wall (2) of approximately constant thickness comprising a front face (3), a rear face (4) and a peripheral face (5); a first lip (6) along each horizontal edge of said front face (3); a second lip (7) down each vertical edge of said front face (3); first and second ribs (8, 9) forming with the first and second lips (6, 7) a grid of cells (10) suitable for filling with insulating materials (11) and accepting an interior trim (14) to mask the entire grid; a peripheral edging (23) creating at least one bearing face and a barrier buffer; and at least first and second fixing members (20, 21) for connecting the prefabricated elements (1) to each other.