Pre-fabricated Pothole Patch with Waterproof Seal

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current pothole repair methods often result in temporary fixes due to insufficient compression and curing time of asphalt fill, leading to frequent repairs and high maintenance costs, as well as damage to vehicles, with water intrusion and erosion causing cracks and further damage.

Innovation Solution

A pre-fabricated patch with a wear layer for traction, a structural reinforcement layer to prevent cracking, and a bottom sealing layer to create a waterproof seal, ensuring the filler material can cure without water seepage and withstand vehicular loads, comprising aggregate stone frit, viscous bitumen, and fibrous materials.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If asphalt fill is placed and compressed to repair a pothole, then the pothole is filled and leveled with the road surface, but the asphalt is prone to develop stress cracks and the repair is only temporary due to insufficient curing time and water intrusion

Engineering Contradiction:
Improvedurability of pothole repairVSAvoidcuring time of asphalt fill
Core Design Contradiction:
ReliabilityVSDuration of action of stationary object

Solution Approach 1:

The patent applies preliminary action by pre-fabricating a patch with a waterproof membrane and reinforcement layers before the asphalt fill is placed. This patch is installed over the cured asphalt, providing immediate protection against water intrusion and crack propagation, eliminating the need to wait for the asphalt to fully cure before protecting it.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent segments the repair system into distinct functional layers: the asphalt fill layer for structural repair, the waterproof membrane layer for water protection, and the reinforcement layer for crack prevention. This segmentation allows each layer to perform its specific function independently, with the membrane and reinforcement providing protection regardless of the asphalt's curing state.

Inventive Principle:
Principle #1Segmentation

2Productivity

If asphalt fill is placed without sufficient compression or curing time, then the repair can be applied quickly, but the asphalt develops stress cracks particularly at joint edges adjacent to the surrounding road surface

Engineering Contradiction:
Improvespeed of pothole repairVSAvoidresistance to stress cracks in asphalt fill
Core Design Contradiction:
ProductivityVSStrength

Solution Approach 1:

The patch with waterproof membrane and reinforcement is prepared in advance and installed immediately over the asphalt fill, providing preemptive protection against stress cracks at joint edges before they can develop from water intrusion or loading.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The reinforcement layer and waterproof membrane act as a cushioning protection layer that absorbs and distributes stress, preventing stress concentration at the joint edges where cracks typically initiate, thereby protecting the asphalt fill from crack propagation.

Inventive Principle:
Principle #11Beforehand cushioning (Prior cushioning)

3Ease of manufacture

If the interface between asphalt fill perimeter and existing road surface is not sealed, then the repair process is simple, but rainwater collects below the pothole repair surface leading to erosion of the asphalt fill

Engineering Contradiction:
Improvesimplicity of repair processVSAvoidwater erosion of asphalt fill
Core Design Contradiction:
Ease of manufactureVSObject-affected harmful factors

Solution Approach 1:

The waterproof membrane is pre-installed over the asphalt fill perimeter and integrated with the surrounding road surface before any water intrusion can occur, creating a pre-established seal that prevents rainwater collection and erosion without requiring complex additional sealing steps.

Inventive Principle:
Principle #10Preliminary action

4Reliability

If repetitive repairs are performed at the same locations due to temporary fixes, then the immediate potholes are repaired, but maintenance costs increase over time

Engineering Contradiction:
Improvelongevity of pothole repairVSAvoidfrequency of repetitive repairs
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

By installing the waterproof membrane and reinforcement layer in advance over the asphalt fill, the system provides long-term protection that prevents the typical failure modes (water intrusion, crack propagation), thereby extending the service life of the repair and reducing the frequency of repetitive repairs.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The multi-layer patch structure provides beforehand protection against the cumulative effects of weathering and repetitive loading, cushioning the asphalt fill from damage that would otherwise require repeated repairs over time.

Inventive Principle:
Principle #11Beforehand cushioning (Prior cushioning)

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

The patch significantly extends the longevity of pothole repairs by preventing crack propagation and water intrusion, reducing maintenance costs and vehicle damage, while maintaining structural integrity under repetitive loads and weather conditions.

Implementation Method 1

a bottom sealing layer to not only form a seal or barrier with the surrounding adjacent road surface to prevent water migration into the repaired pothole

Methodology Applied
Scientific EffectSealing barrier:

Implementation Method 2

the top surface is made of a material for frictional contact with the tires of oncoming traffic to provide traction similar to the surrounding roadway surface

Methodology Applied
Scientific EffectFriction: Friction

Implementation Method 3

Disposed in-between the wear layer and the bottom sealing layer is a structural reinforcement layer to prevent the patch from tearing apart

Methodology Applied
Scientific EffectStructural reinforcement:

Data Source

PatentEP2823103B1Pothole repair patch and method of installation
Publication Date: 2017.05.10 AMERICAN ROAD PATCH
  • EP2823103B1 patent drawingFigure 1~3
  • EP2823103B1 patent drawingFigure 4~5

AI summary

A pre-fabricated road patch and method of installation for repair of potholes is disclosed. The patch is placed upon the compacted top surface of a repaired pothole, overlapping onto the adjacent road surface and compressed. The patch forms a water proof seal over the surface area of the patch preventing water from seeping into the repaired pothole.