Prefabricated Core Smart Zone Structure for Rapid Building Assembly

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Traditional on-site building construction is time-consuming, labor-intensive, generates waste, and is susceptible to delays due to weather and material delivery issues, leading to increased costs and environmental concerns.

Innovation Solution

A prefabricated core smart zone structure, including a frame with integrated plumbing, electrical, and HVAC systems, is manufactured off-site and transported as a 'plug-and-play' module, allowing for rapid assembly and integration into a building structure, adaptable to various construction methods.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If traditional on-site construction methods are used, then flexibility and adaptability in construction are maintained, but construction time is excessive and labor intensity is high

Engineering Contradiction:
Improveconstruction speedVSAvoidconstruction timeline
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The core smart zone structure is prefabricated off-site with all plumbing, electrical, and HVAC systems pre-installed and tested before transportation to the construction site. This preliminary preparation of critical systems dramatically reduces on-site construction time and eliminates weather-related delays.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The building is divided into modular components, with the core smart zone (containing kitchen and bathroom) fabricated as a separate prefabricated module. This segmentation allows parallel production of different building components and enables rapid assembly at the construction site.

Inventive Principle:
Principle #1Segmentation

2Ease of manufacture

If on-site construction is performed, then material flexibility is maintained, but material waste is significant

Engineering Contradiction:
Improvematerial utilization efficiencyVSAvoidconstruction waste
Core Design Contradiction:
Ease of manufactureVSLoss of substance

Solution Approach 1:

All building materials and components are precisely measured, cut, and assembled during off-site prefabrication of the core smart zone module. This advance preparation eliminates on-site material cutting and shaping, thereby minimizing construction waste.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The construction approach transitions from traditional on-site assembly to off-site prefabrication with precise digital fabrication. This parameter change in the manufacturing process enables exact material utilization and reduces waste generation.

Inventive Principle:
Principle #35Parameter changes

3Productivity

If traditional construction sequencing is used, then construction flexibility is maintained, but project duration is extended

Engineering Contradiction:
Improveconstruction efficiencyVSAvoidproject completion time
Core Design Contradiction:
ProductivityVSDuration of action of moving object

Solution Approach 1:

Critical building systems (plumbing, electrical, HVAC) are pre-installed and tested in the core smart zone module before it reaches the construction site. This preliminary completion of essential systems eliminates sequential dependencies and accelerates overall project timeline.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

Multiple construction activities (framing, plumbing installation, electrical wiring, HVAC placement, insulation) are merged into a single off-site prefabrication process. This consolidation of operations that would traditionally occur sequentially on-site into parallel off-site processes dramatically reduces total project duration.

Inventive Principle:
Principle #5Merging (Combining)

Data Source

PatentUS20250314058A1Core smart zone structure and method
Publication Date: 2025.10.09 HUNT JOSHUA
  • US20250314058A1 patent drawing
  • US20250314058A1 patent drawing
  • US20250314058A1 patent drawing

AI summary

A core smart zone structure and method are disclosed herein. The core smart zone structure is fabricated off-site and transported to an on-site location for assembly and construction of a building structure. The prefabricated core smart zone structure includes the ‘wet’ rooms of the building, such as a kitchen and one or more bathrooms, and preinstalled utility installations for serving the prefabricated core smart zone structure and other rooms of a building structure.