Problem

Existing methods for constructing paved road surfaces with low adhesion coefficients, such as basalt brick or tile brick roads, often result in uneven surfaces due to uneven roadbeds and surfaces, leading to inaccurate experimental data during testing.

Innovation Solution

A top-down construction type assembly method for paved road surfaces, involving the manufacturing of prefabricating slabs using a top-down method with threaded sleeves, and a precise mounting process including altitude and position fine-tuning, followed by grouting to ensure evenness and stability.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If prefabricating blocks are directly laid on the road surface after preparation, then construction efficiency is improved, but road surface evenness deteriorates due to uneven roadbed and road surface

Engineering Contradiction:
Improveconstruction efficiencyVSAvoidroad surface evenness
Core Design Contradiction:
ProductivityVSManufacturing precision

Solution Approach 1:

The patent applies preliminary action by preparing and pre-leveling the roadbed and road surface before laying the prefabricating blocks. The roadbed is leveled and compacted in advance, and the road surface is prepared with proper gradient and evenness before block installation, ensuring that the blocks are laid on a uniform base rather than directly on uneven ground

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent segments the construction process into distinct phases: roadbed preparation and leveling, road surface preparation, block laying, and joint filling. This segmentation allows each phase to be optimized independently, with the roadbed and surface prepared separately before block installation, improving both efficiency and precision

Inventive Principle:
Principle #1Segmentation

2Device complexity

If conventional paving methods are used, then construction simplicity is maintained, but experimental data accuracy deteriorates due to uneven water film formation

Engineering Contradiction:
Improveconstruction simplicityVSAvoidexperimental data accuracy
Core Design Contradiction:
Device complexityVSMeasurement precision

Solution Approach 1:

The patent applies preliminary action by pre-leveling the roadbed and preparing the road surface with proper gradient and evenness before laying the prefabricating blocks. This preliminary preparation ensures that when blocks are installed, they form a uniform surface that produces accurate experimental data during testing

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent implements feedback by checking and adjusting the road surface evenness during the construction process. The gradient and surface uniformity are monitored and adjusted before block laying to ensure that the final surface will produce accurate experimental data, allowing for corrective actions if deviations are detected

Inventive Principle:
Principle #23Feedback

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

This method eliminates on-site concrete bonding, improves the stability and evenness of the road surface, and reduces the separation of bricks during operation, resulting in a more accurate and durable road surface.

Implementation Method 1

screwing a leveling bolt, where a lower end of the leveling bolt is contacted with a concrete surface of the lower bearing plate, into the threaded sleeves of each of the prefabricating slabs, and lifting the prefabricating slabs by screwing the leveling bolt

Methodology Applied
Scientific EffectScrew mechanism: Screw

Implementation Method 2

performing a grouting construction

Methodology Applied
Scientific EffectGravitational flow: Gravitation

Implementation Method 3

performing a grouting construction

Methodology Applied
Scientific EffectCapillary action: Capillary Action

Data Source

PatentUS12281451B2Top-down construction-type assembly construction method for paved road surface
Publication Date: 2025.04.22 THE FIRST ENG CO LTD OF CTCE GRP
  • US12281451B2 patent drawing
  • US12281451B2 patent drawing
  • US12281451B2 patent drawing

AI summary

A top-down construction type assembly construction method for paved road surface, including the following steps: step I, manufacturing prefabricating slabs: using a top-down method to manufacture the prefabricating slabs, and providing bolt sleeves, inside the prefabricating slabs, which are evenly arranged in the prefabricating slabs; step II, mounting the prefabricating slabs: on a lower bearing plate, placing the prefabricating slabs in one step, performing a fine tuning on a position and an altitude of the prefabricating slabs, performing a grouting construction, finally forming the paved road surface; the prefabricating slabs are manufactured by laying bricks and pouring concrete, the prefabricating slabs are rolled over and mounted, thus eliminating on-site concrete bonding between bricks and the lower bearing plate, improving overall stability of the bricks and the prefabricating slabs after being mounted, assembled mounting for a paved road surface is implemented, and the construction period is shortened.