Printing Apparatus Controller Timing Execution Reports Before Power Loss
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
In MDM systems, printing apparatuses face challenges in transmitting execution completion reports to external mediation apparatuses after power supply-off operations, as the power loss prevents report transmission.
Innovation Solution
The printing apparatus is configured to determine if an instruction involves a power supply-off operation and transmit an execution completion report either at the time of processing completion or at a predetermined timing before the operation, ensuring the report is sent before power loss.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Reliability
If the printing apparatus transmits the execution completion report after power supply-off operation, then the report transmission timing is optimized for normal operations, but the report cannot be transmitted when power is lost
Solution Approach 1:
The controller determines whether the instructed processing involves a power supply-off operation and, if so, transmits the execution completion report at a predetermined timing before the power supply-off is executed. This preliminary action ensures the report is sent while power is still available, preventing loss of transmission capability.
Solution Approach 2:
The system dynamically adjusts the report transmission timing based on the type of processing instructed. For processing involving power supply-off, the report is transmitted before power loss; for other processing, the report is transmitted upon completion. This dynamic adaptation resolves the contradiction between timely reporting and reliable transmission.
2Loss of energy
If the printing apparatus executes power supply-off operation, then energy consumption is reduced, but the ability to transmit data is lost
Solution Approach 1:
The controller transmits the execution completion report at a predetermined timing before the power supply-off operation is executed. This ensures that the information about processing completion is communicated to the external mediation apparatus before power is lost, preventing information loss while still allowing the apparatus to power down and reduce energy consumption.
3Measurement precision
If the printing apparatus transmits execution completion report upon processing completion, then accurate reporting is achieved, but power loss may prevent transmission
Solution Approach 1:
The system dynamically determines the report transmission timing based on the processing type. When the instructed processing involves power supply-off, the report is transmitted at a predetermined timing before power loss. For other processing, the report is transmitted upon completion. This dynamic approach maintains timing accuracy while ensuring transmission reliability.
Solution Approach 2:
For processing involving power supply-off, the controller transmits the execution completion report before the power supply-off is executed. This preliminary transmission ensures that the report is sent while the apparatus still has power, combining accurate reporting with reliable transmission.
Data Source
AI summary
A printing apparatus including: a printing unit; and a controller configured to: receive a processing execution instruction for executing a predetermined processing from an external mediation apparatus; determine whether the received processing execution instruction is a first instruction that does not involve a power supply-off operation; and transmit an execution completion report to the external mediation apparatus such that: in a case where the determining determines that the processing execution instruction is the first instruction, the execution completion report is transmitted to the external mediation apparatus at a time when execution of processing instructed by the first instruction is completed; and in a case where the determining does not determine that the processing execution instruction is the first instruction, the execution completion report is transmitted to the external mediation apparatus at a predetermined timing which is before execution of processing instructed by the processing execution instruction is completed.


