Process Control System Virtual Commissioning via Simulation Data

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional process control systems face inefficiencies in verifying system performance and functionality before commissioning, requiring actual plant operation and resulting in high costs and low efficiency, especially due to the need for physical material runs and potential post-commissioning corrections.

Innovation Solution

A process control system that includes a network, field devices capable of outputting measurement and simulation data, and a simulator to generate and transmit simulation data, allowing for system-wide verification without actual plant operation by setting devices to simulation mode, thereby enabling pre-commissioning verification of system performance and functionality.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If actual plant operation is used for verification, then system-wide verification can be performed, but costs increase and efficiency decreases

Engineering Contradiction:
Improveverification accuracyVSAvoidcommissioning efficiency
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The patent creates a virtual copy of the entire control system including controllers, field devices, and networks. This virtual model replicates the physical system's structure and behavior, allowing comprehensive verification of system-wide items without requiring actual plant operation. The virtual environment mirrors real-world conditions while eliminating the need for physical material runs, thus maintaining verification accuracy while dramatically improving commissioning efficiency.

Inventive Principle:
Principle #26Copying

Solution Approach 2:

The patent enables all verification activities to be performed in advance during the virtual commissioning phase before physical plant operation begins. By conducting system-wide verification, network load testing, device parameter validation, and communication quality checks in the virtual environment, potential issues are identified and resolved before commissioning, eliminating the need for post-commissioning corrections and rework.

Inventive Principle:
Principle #10Preliminary action

2Reliability

If physical material runs are performed for verification, then actual system performance can be tested, but costs increase significantly

Engineering Contradiction:
Improveperformance verificationVSAvoidcommissioning cost
Core Design Contradiction:
ReliabilityVSLoss of energy

Solution Approach 1:

The virtual control system replicates the physical system's behavior and responses without requiring actual material flow. Virtual materials or simulated process conditions are used instead of physical materials, eliminating costs associated with material consumption, disposal, and environmental handling while maintaining the ability to verify system performance under various operating conditions.

Inventive Principle:
Principle #26Copying

Solution Approach 2:

The virtual environment acts as an intermediary between the verification process and the physical plant. It provides a safe, cost-effective medium for testing system performance, validating control logic, and stress-testing networks without the need for expensive physical material runs. The virtual model mediates between verification requirements and cost constraints by simulating real-world scenarios without physical resource consumption.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Reliability

If post-commissioning corrections are made, then system issues can be fixed, but time and efficiency are lost

Engineering Contradiction:
Improvesystem correctnessVSAvoidcommissioning time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent performs all necessary verification and validation activities before physical commissioning begins. The virtual commissioning process systematically tests control logic, network performance, device parameters, and system integration in advance, identifying and resolving all potential issues before the plant goes operational. This preliminary verification eliminates the need for post-commissioning corrections, ensuring system correctness while minimizing commissioning time.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The virtual commissioning system provides comprehensive feedback on system performance, control logic effectiveness, and potential issues before physical commissioning. By analyzing results from virtual testing, operators can optimize control parameters, identify logic errors, and prepare corrective actions in advance, ensuring the system is ready for immediate successful operation without requiring post-commissioning adjustments.

Inventive Principle:
Principle #23Feedback

Data Source

PatentUS9250616B2Process control system
Publication Date: 2016.02.02 YOKOGAWA ELECTRIC CORP
  • US9250616B2 patent drawing
  • US9250616B2 patent drawing
  • US9250616B2 patent drawing

AI summary

A process control system that controls an industrial process implemented in a plant, may include: a network provided in the plant; a first field device that is connected to the network, the first field device being configured to output one of measurement data, which is obtained by measuring a state quantity in the industrial process, and first simulation data, which simulates the state quantity; a controller that is connected to the network, the controller being configured to perform control in response to one of the measurement data and the first simulation data output from the first field device; and a simulator configured to generate the first simulation data to be output from the first field device.