Production Management System for Live Performance Content Control

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Users of social media platforms and live audiences lack systemic capabilities to communicate with performing talent or production managers in a timely and meaningful manner, limiting their ability to influence or modify live performance content effectively.

Innovation Solution

A computer-implemented system and method that facilitates communication between social media users, live audience members, and production managers through a production management system, enabling timely and predictable modification of live performance content based on user preferences using wireless devices and mobile application clients.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If users are given systemic capabilities to communicate with performing talent and production managers to influence live performance content, then content precision and user satisfaction improve, but system complexity and resource management difficulty increase

Engineering Contradiction:
Improvecontent precisionVSAvoidsystem complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The patent introduces a production management system as an intermediary between users and the performance production process. This system receives content control requests from users via wireless devices, processes them through defined workflows, and implements approved changes to the production plan. The intermediary structure enables precise user influence on content while maintaining organized resource management and production control.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Adaptability or versatility

If real-time content modification is enabled based on user feedback, then adaptability and user engagement improve, but production efficiency and resource management deteriorate

Engineering Contradiction:
Improvecontent adaptabilityVSAvoidproduction efficiency
Core Design Contradiction:
Adaptability or versatilityVSProductivity

Solution Approach 1:

The system implements dynamic adaptability by allowing the production plan to be modified in real-time based on user feedback during the performance. The production management system processes content control requests, evaluates them against predefined criteria, and implements approved changes to the production plan dynamically. This enables the system to adapt to user preferences while maintaining operational efficiency through structured decision-making workflows.

Inventive Principle:
Principle #15Dynamics

3Manufacturing precision

If multiple user inputs are processed to customize performance content, then content quality and personalization improve, but processing time and system resource requirements increase

Engineering Contradiction:
Improvecontent qualityVSAvoidprocessing time
Core Design Contradiction:
Manufacturing precisionVSLoss of time

Solution Approach 1:

The system performs preliminary actions by pre-defining content control parameters, user preferences, and production constraints before the performance begins. User profiles and preferences are collected in advance, and the production management system is pre-configured with approved content modification options. During the performance, the system processes user inputs against these pre-established criteria, enabling rapid decision-making and content customization without extensive real-time processing.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS20240098327A1Computer implemented system and method for on demand content control of individialized production plan to be implemented in live performance venue to user wireless computing devices associated with social media users and live audience.
Publication Date: 2024.03.21 NEW HEAVY ENT LLC
  • US20240098327A1 patent drawing
  • US20240098327A1 patent drawing

AI summary

A computer-implemented method, system, and computer readable medium comprising executable instructions, to control content of a production plan to be implemented at a performance venue may include, configuring a plurality of a user wireless computing device to execute a user mobile application and performing production content management instructions to perform: first providing production plan information to the user mobile application; first receiving a proposed content control request from the application; first determining a content control decision in relation to said proposed content control request notice of the decision; incorporating a content control action in relation to the production plan; and providing, to the user mobile application, an implementation of the performance plan incorporating the content control action.