Program Production Method for Dynamic Display Scheduling
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
Current program production methods for display screens struggle with complex scheduling scenarios, where multiple media with exclusive play time periods and cyclic playback requirements lead to inefficiencies and the need for frequent program updates, resulting in a complex and time-consuming process.
Innovation Solution
A program production method that involves acquiring media, generating playlists associated with each medium, creating programs with scheduled play regions, and managing these regions to ensure continuous playback without blank screens, allowing for flexible scheduling and easy adaptation to changing requirements.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Device complexity
If a simple program form is used where one medium is played at the same time on the whole display screen, then the program production process is simple, but it cannot meet complex and diversified program scheduling scenarios
Solution Approach 1:
The display screen is divided into multiple play regions, and the program is divided into multiple segments that can be independently scheduled. Each play region can display different media content simultaneously, allowing complex scheduling scenarios to be handled by combining multiple simple segments rather than requiring a completely complex program structure.
2Measurement precision
If absolute time points are set for each medium's play time, then the scheduling is precise, but it becomes difficult to adapt when advertiser requirements change
Solution Approach 1:
The system allows dynamic adjustment of play time configurations. When advertiser requirements change, the scheduling parameters can be modified without regenerating the entire program. The play regions and media assignments are dynamically reconfigurable, enabling the system to adapt to changing requirements while maintaining precise time control through updated scheduling parameters.
3Reliability
If manual ensuring of continuity is required to avoid blank screens, then blank screens are avoided, but the program production process becomes complex and time-consuming
Solution Approach 1:
Multiple media play tasks are merged into a single program structure with multiple play regions. The system automatically coordinates the playback of different media in different regions, ensuring continuous content display across the entire screen without manual intervention for continuity checking. This merging approach maintains reliability while reducing production complexity.
Data Source
AI summary
At least some embodiments of the present disclosure disclose a program production method, a program production device, a program production system and a computer-readable medium. The program production method includes that: at least one medium is acquired; at least one playlist is generated according to the at least one medium, each of the at least one playlist being associated with the at least one medium; at least one program is generated according to the at least one playlist, each of the at least one program including a play region and the play region corresponding to the at least one playlist; and the play region is scheduled.


