Project Management Front Loading Rate Calculation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Risk management in project management often fails to effectively reduce risks, as existing methods focus on extracting risks from past projects without adequately addressing them, leading to unresolved concerns and anxieties among project members.

Innovation Solution

A project management support system that calculates a 'front loading rate' of risk measures to problems, displaying the results in a manner that visualizes risk reduction, promoting proactive risk management by recording measures and problems in separate tables and calculating the ratio of measures to problems.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If risk measures are extracted from past similar projects at project launch, then risk identification is performed, but risk reduction is insufficient and risks are managed as problems after manifestation

Engineering Contradiction:
Improverisk reduction effectivenessVSAvoidtiming of risk management
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The system performs preliminary action by calculating the front loading rate to determine whether risk measures should be taken before problems manifest. By comparing the ratio of recorded measures to total problems+measures against a threshold, the system proactively identifies when sufficient risk mitigation actions have been planned, enabling early intervention before risks materialize into problems.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system implements feedback by continuously monitoring the front loading rate and providing visual feedback through color-coded indicators (green for sufficient measures, red for insufficient measures). This feedback mechanism allows project teams to assess their risk management status and take corrective actions before risks manifest, closing the loop between risk identification and risk mitigation.

Inventive Principle:
Principle #23Feedback

2Loss of information

If risk management tables are created at project launch, then risk documentation is established, but project members' concerns and anxieties remain unrecognized

Engineering Contradiction:
Improverecognition of project concernsVSAvoidrisk management process
Core Design Contradiction:
Loss of informationVSDevice complexity

Solution Approach 1:

The system applies self-service by enabling project members to directly input their concerns and anxieties into the system, which are then automatically processed to calculate the front loading rate. This self-service approach ensures that individual concerns are captured and recognized without requiring complex manual review processes, while still integrating into the overall risk management framework.

Inventive Principle:
Principle #25Self-service

3Measurement precision

If measures are recorded in separate tables from problems, then risk management tracking is enabled, but visual recognition of risk reduction level is difficult

Engineering Contradiction:
Improverisk reduction measurementVSAvoidvisual recognition of risk status
Core Design Contradiction:
Measurement precisionVSEase of operation

Solution Approach 1:

The system uses color changes to provide intuitive visual recognition of risk reduction status. The display unit shows green indicators when the front loading rate exceeds the threshold (indicating sufficient risk measures) and red indicators when it falls below the threshold (indicating insufficient measures). This color-coded visual feedback makes it immediately clear whether risk reduction goals are being met without requiring detailed analysis of the underlying data.

Inventive Principle:
Principle #32Color changes

Data Source

PatentUS10810551B2Project management support system, project management support method, and non-transitory computer readable medium storing a project management support program
Publication Date: 2020.10.20 MITSUBISHI ELECTRIC CORP
  • US10810551B2 patent drawing
  • US10810551B2 patent drawing
  • US10810551B2 patent drawing

AI summary

In a project management support system, a ratio calculation unit calculates, as an “FL rate of project management”, a ratio of the number of measures recorded in a risk measure to-do list to a sum of the number of problems recorded in a problem management table and the number of measures recorded in the risk measure to-do list. An achievement level calculation unit calculates a level of goal achievement for the “FL rate of project management” from a calculation result by the ratio calculation unit and a target value of the “FL rate of project management”. A display control unit sets a display mode of the calculation result by the ratio calculation unit in accordance with the level of goal achievement calculated by the achievement level calculation unit and performs control to display the calculation result on a display in the display mode being set.