Project Management System Using Interactive Mapping and SMS

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current project management processes in construction and similar industries are inefficient, particularly in managing personnel and equipment across multiple locations, leading to challenges in resource allocation, cost estimation, and project timeline management.

Innovation Solution

A system and method utilizing interactive mapping, filtering, and SMS technology to efficiently manage and allocate personnel and equipment by allowing users to visualize, filter, and assign resources within a defined geographic area, enabling touch-based commands for resource reassignment and automated SMS messaging.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If manual processes are used to manage personnel and equipment allocation across multiple construction sites, then flexibility in management approaches is maintained, but time consumption and labor intensity increase significantly

Engineering Contradiction:
Improvemanual management flexibilityVSAvoidtime consumption for resource allocation
Core Design Contradiction:
Ease of operationVSLoss of time

Solution Approach 1:

The patent replaces manual mechanical processes (notebook tracking, phone calls, physical resource allocation) with an automated electronic system that uses databases, GPS tracking, and automated messaging to manage personnel and equipment allocation across multiple construction sites, thereby reducing time consumption while maintaining management flexibility

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Solution Approach 2:

The system enables self-service functionality where personnel and equipment automatically report their locations and availability through the mobile application, and the system automatically matches them with appropriate projects based on predefined criteria, reducing the need for manual intervention in resource allocation

Inventive Principle:
Principle #25Self-service

2Ease of manufacture

If manual tracking methods are used for monitoring subcontractors and personnel, then implementation simplicity is maintained, but monitoring efficiency and coverage decrease

Engineering Contradiction:
Improveimplementation simplicityVSAvoidmonitoring efficiency
Core Design Contradiction:
Ease of manufactureVSProductivity

Solution Approach 1:

The mobile application serves multiple functions including GPS tracking, automated messaging, resource allocation, project management, and reporting capabilities within a single platform, enabling comprehensive monitoring of subcontractors and personnel across multiple sites while maintaining ease of implementation through a unified system

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The system introduces an intermediary automated communication layer that sends SMS notifications and updates to personnel and subcontractors, enabling efficient monitoring and coordination without requiring direct manual intervention from project managers for each communication

Inventive Principle:
Principle #24Intermediary (Mediator)

3Productivity

If resources are allocated without geographic consideration, then allocation speed may be increased, but resource optimization and cost efficiency decrease

Engineering Contradiction:
Improveresource allocation speedVSAvoidfuel consumption and carbon emissions
Core Design Contradiction:
ProductivityVSLoss of energy

Solution Approach 1:

The system applies local quality optimization by automatically prioritizing the allocation of personnel and equipment based on their geographic proximity to project sites, using GPS data to identify the nearest available resources and thereby reduce travel distance, fuel consumption, and carbon emissions while maintaining efficient allocation speeds

Inventive Principle:
Principle #3Local quality

Data Source

PatentUS11836655B2Project management devices, systems and methods
Publication Date: 2023.12.05 CHRISTMAN CONSTRUCTORS INC
  • US11836655B2 patent drawing
  • US11836655B2 patent drawing
  • US11836655B2 patent drawing

AI summary

A device, system and method for mapping and filtering project data, such as construction project criteria, which may have the steps of selecting a map view option from of list of application features; launching a map view in response to selecting the map view; selecting at least one database filter; applying the at least one selected database filter to a system database to generate a list of selected filtered records; and generating a map showing the geographic locations of the selected filtered records. The at least one filter may be selected from at least one of the group of personnel, equipment, project sites and/or offices. The at least one filter can be a personnel filter, filtered by at least one of trade, skill level and/or active status.