Project Management System Role Handler Assignment

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current project management systems face challenges in effectively organizing and tracking large projects due to communication breakdowns between team members, leading to inefficiencies in task management and resource allocation.

Innovation Solution

A project management system that assigns role handlers to specific tasks, provides notifications for task completion, and allows for review and approval processes, ensuring clear communication and due dates for task completion, implemented through a computer program product with a user-friendly interface and email notifications.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If traditional project management methods are used to organize and track projects, then resources and time are expended on manual coordination, but communication breakdowns between team members occur leading to ineffective task management

Engineering Contradiction:
Improvecommunication effectivenessVSAvoidtime for organizing and tracking projects
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent introduces a project management system as an intermediary platform that facilitates communication and coordination between team members. The system includes a server that sends notifications to user devices, acting as a mediator to ensure information flows reliably between project members without direct manual communication, thereby improving communication effectiveness while reducing time spent on coordination.

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The system enables team members to autonomously manage their own tasks through the platform. Users can view their assigned tasks, deadlines, and project updates on their devices without requiring manual briefings or constant communication from project managers. This self-service capability reduces communication breakdowns and frees up time for actual project work.

Inventive Principle:
Principle #25Self-service

2Productivity

If detailed task hierarchies are implemented to track project progress, then task organization improves, but system complexity increases making it harder to manage

Engineering Contradiction:
Improvetask management efficiencyVSAvoidsystem structure complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The patent implements task segmentation by dividing projects into multiple hierarchical levels including projects, task groups, and individual tasks. Each level can be independently managed and viewed. The system allows users to navigate through these segmented levels on their devices, providing detailed task organization without overwhelming complexity through the modular structure that can be expanded or collapsed as needed.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The project management system is designed as a universal platform that handles multiple functions within a single interface. It can manage projects, tasks, notifications, and team member assignments all through one system. This multi-functionality reduces the need for separate tracking tools and simplifies the overall system structure while maintaining detailed task management capabilities.

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Manufacturing precision

If role handlers are assigned to multiple tasks to improve accountability, then task review quality improves, but the number of notifications and system operations increases

Engineering Contradiction:
Improvetask review qualityVSAvoidnumber of notifications
Core Design Contradiction:
Manufacturing precisionVSQuantity of substance

Solution Approach 1:

The system implements structured feedback loops where role handlers receive notifications when tasks are assigned or updated, perform their reviews, and the system tracks the feedback provided. This formalized feedback mechanism ensures thorough task review quality while consolidating communication through the system rather than multiple separate notifications, as all interactions are channeled through the centralized platform.

Inventive Principle:
Principle #23Feedback

Data Source

PatentUS9129267B2Project management systems and methods thereof
Publication Date: 2015.09.08 KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGY
  • US9129267B2 patent drawing
  • US9129267B2 patent drawing
  • US9129267B2 patent drawing

AI summary

Project management systems and methods to streamline project planning, task management, time management, and other similar applications. The method includes filing a request to start a project on a project management system. The method further includes receiving notice that role handlers have been assigned to a plurality of tasks required to complete the project. The method further includes performing at least one task of the plurality of tasks. The method further includes receiving notice that the at least one task has been reviewed by at least one of the assigned role handlers.