Project Management Tradeoff Between Time and Quality

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In project planning, there is a lack of effective methods to accurately relate quality to time for tasks, as existing approaches require extensive data points that are often unavailable, making it difficult to determine the quality degradation and time savings when rushing task completion.

Innovation Solution

A computerized system establishes tradeoff relationships between time and quality using relational models (exponential, quadratic, or cubic) based on two data points, allowing project managers to manipulate task data structures to balance quality and time through a graphical user interface, without needing extensive data gathering.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Loss of time

If a task is rushed to be completed ahead of its originally established due time, then the time to complete the task is reduced, but the quality of the result deteriorates

Engineering Contradiction:
Improvetime to complete taskVSAvoidquality of task result
Core Design Contradiction:
Loss of timeVSManufacturing precision

Solution Approach 1:

The system applies parameter changes by using non-linear mathematical models (exponential, quadratic, or cubic relationships) to transform the relationship between time and quality parameters. These models allow the system to predict quality outcomes based on time reductions, enabling project managers to make informed decisions about task rushing while understanding the precise quality implications.

Inventive Principle:
Principle #35Parameter changes

2Measurement precision

If extensive data points are gathered for every type of task and industry to relate quality to time, then the accuracy of quality-time relationship is improved, but the complexity of the system increases

Engineering Contradiction:
Improveaccuracy of quality-time relationshipVSAvoiddata gathering requirements
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The system applies universality by creating multi-functional mathematical models that can be applied across different task types and industries without requiring task-specific data gathering. The exponential, quadratic, and cubic relationships serve as universal frameworks that work for various scenarios, eliminating the need for extensive industry-specific data collection while maintaining prediction accuracy.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentUS10373092B2System and method for providing a tradeoff between time and quality for a task
Publication Date: 2019.08.06 ORACLE INT CORP
  • US10373092B2 patent drawing
  • US10373092B2 patent drawing
  • US10373092B2 patent drawing

AI summary

Systems, methods, and other embodiments are disclosed that are configured to make tradeoffs between time and quality for tasks of a project in a computerized project plan. In one embodiment, at task of a project is represented as a task data structure in a computerized project plan. A time duration in which to complete the task may be automatically transformed in the task data structure by manually changing a quality level of a result of the task in the task data structure in response to user interaction with a graphical user interface of the computerized project plan. Similarly, the quality level of the result of the task may be automatically transformed in the task data structure by manually changing the time duration in which to complete the task in the task data structure in response to user interaction with the graphical user interface of the computerized project plan.