Project Management System with Automatic Timesheet Validation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional project management tools, such as Microsoft Project, require significant manual effort from project managers to assign resources to tasks and validate timesheets, leading to inefficiencies and bottlenecks in project completion.

Innovation Solution

A project management system that allows for the assignment of teams of resources to deliverables in a one-to-one relationship, enabling automatic validation of timesheets entered by personnel, thereby reducing the time required for scheduling and validation processes.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If project managers manually assign resources to tasks and validate timesheets using conventional project management tools, then resource assignment and timesheet validation can be performed, but significant manual effort and time are required, creating bottlenecks in project completion

Engineering Contradiction:
Improveproject completion speedVSAvoidtime for resource assignment and timesheet validation
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The system enables automatic timesheet validation by matching personnel time entries against assigned tasks and deliverables. The computer automatically validates timesheets without requiring project manager intervention, allowing the system to serve itself in the validation process and eliminating this manual bottleneck.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

Project managers pre-assign teams of resources to deliverables in advance using the system. This preliminary assignment establishes the framework for automatic timesheet validation later, allowing the system to pre-process resource allocation so that subsequent timesheet validation can occur automatically without manual review.

Inventive Principle:
Principle #10Preliminary action

2Reliability

If project managers spend extensive time tracking authorized personnel and analyzing time input, then accurate project tracking is achieved, but project managers become bottlenecks due to the time required for these tasks

Engineering Contradiction:
Improveaccuracy of project trackingVSAvoidproject manager efficiency
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The system provides automated feedback mechanisms where timesheet entries are automatically validated against the pre-assigned resource-deliverable relationships. The computer system continuously monitors and validates time entries, providing immediate feedback on authorization status without requiring manual analysis by project managers, thus maintaining reliability while improving efficiency.

Inventive Principle:
Principle #23Feedback

3Ease of operation

If conventional project management tools are used for resource assignment and timesheet validation, then basic project management functions are provided, but the process requires significant manual intervention and creates inefficiencies

Engineering Contradiction:
Improvesimplicity of resource assignmentVSAvoidcomplexity of validation process
Core Design Contradiction:
Ease of operationVSDevice complexity

Solution Approach 1:

The system combines multiple functions into a unified platform: pre-assignment of resources to deliverables, automatic timesheet validation, and project tracking all occur within the same computer system. This multi-functional approach simplifies operation by providing a single interface while the underlying automated processes handle the complexity of validation rules and matching logic.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentUS8694487B2Project management system
Publication Date: 2014.04.08 ACCENTURE GLOBAL SERVICES LTD
  • US8694487B2 patent drawing
  • US8694487B2 patent drawing
  • US8694487B2 patent drawing

AI summary

A project management system includes a database formed of one or more tables and a computing device having one or more modules configured to: receive data and an identifier of the data, store the data in one or more tables of the database based upon the data identifier, in which the one or more tables in the database are accessible by a database management tool, and produce one or more records corresponding to the data stored in the one or more tables, in which the one or more records are accessible by a project management tool.