Project Planning Tool Automating Task Structure Completion

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Project managers face inefficiencies when creating new project plans, as they often need to modify existing templates to fit their preferences, and manually replicating similar task structures is tedious and time-consuming.

Innovation Solution

A computerized project planning tool that monitors user interactions to learn and record reusable patterns, allowing for automatic completion and modification of task structures based on learned behavior data, reducing the need for manual repetition.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If project managers manually modify templates and replicate task structures, then they can customize project plans to fit preferences, but the process becomes tedious and time-consuming

Engineering Contradiction:
Improvecustomization capabilityVSAvoidtime to create project plan
Core Design Contradiction:
Adaptability or versatilityVSLoss of time

Solution Approach 1:

The system enables itself to learn from user interactions with templates and automatically applies learned patterns to assist the user in creating project plans. The system serves itself by autonomously improving its ability to predict and complete task structures based on observed user behavior, reducing manual effort while preserving customization.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The system monitors and analyzes user interactions with templates, using this feedback to learn reusable patterns. This feedback loop allows the system to continuously improve its predictions and automatically complete task structures in ways that align with user preferences, balancing customization with time efficiency.

Inventive Principle:
Principle #23Feedback

2Productivity

If project managers use copy/paste operations to replicate task structures, then they can reuse similar patterns, but repeated manual modification is tedious and time-consuming

Engineering Contradiction:
Improvetask structure replication efficiencyVSAvoidtime for repeated modifications
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The system learns reusable patterns from user-created task structures and automatically copies these patterns when appropriate. Instead of requiring manual copy/paste operations, the system intelligently identifies and replicates task structure patterns, reducing repetitive manual work while maintaining productivity.

Inventive Principle:
Principle #26Copying

Solution Approach 2:

The system performs preliminary learning by monitoring user interactions with templates in advance. This preliminary action allows the system to have reusable patterns ready before the user needs them, enabling automatic completion of task structures without requiring manual copy/paste or modification operations.

Inventive Principle:
Principle #10Preliminary action

3Adaptability or versatility

If project managers create significantly different project plans, then they can adapt to different industry requirements, but they must manually save and reuse templates

Engineering Contradiction:
Improveindustry-specific customizationVSAvoidtemplate management complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The system autonomously learns from user interactions with different templates and automatically adapts to industry-specific requirements. This self-service capability eliminates the need for manual template saving and reusing, as the system independently manages and applies the appropriate patterns based on observed user behavior.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The system dynamically adapts its behavior based on real-time monitoring of user interactions. Rather than requiring static template management, the system flexibly adjusts its pattern recognition and completion capabilities to match the specific industry requirements and user preferences being demonstrated.

Inventive Principle:
Principle #15Dynamics

Data Source

PatentUS10902339B2System and method providing automatic completion of task structures in a project plan
Publication Date: 2021.01.26 ORACLE INT CORP
  • US10902339B2 patent drawing
  • US10902339B2 patent drawing
  • US10902339B2 patent drawing

AI summary

Systems, methods, and other embodiments are disclosed that are configured to automatically complete the generation of task structures in a project plan. In one embodiment, user data is generated by monitoring interactions of a user with a computer user interface when forming a task structure in a project plan. The user data is compared to learned behavior data. The learned behavior data represents reusable patterns derived from information associated with user creation of previous task structures. If, based on the comparison, the user data matches a reusable pattern of the learned behavior data, a prompt is displayed to the user indicating an option to accept or reject automated completion of the task structure. In response to receiving an acceptance from the user, the forming of the task structure is automatically completed in the project plan based on the matching reusable pattern.