Project Planning System Automating Task Generation from Product Classes

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current project planning systems require manual entry and assignment of tasks, leading to inefficiencies and increased human error, which can reduce customer satisfaction and operational efficiency for service providers offering installation, configuration, and maintenance services.

Innovation Solution

A system that utilizes product data to automate the creation of project plans by categorizing products into labor, parts, or agreements, allowing for the generation and assignment of tasks based on product classes, thereby integrating product data from customer quotes into project planning modules.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If manual entry and assignment of tasks is used in project planning systems, then flexibility in task management is maintained, but efficiency and productivity are reduced due to increased human error and time consumption

Engineering Contradiction:
Improvetask generation efficiencyVSAvoidmanual task entry
Core Design Contradiction:
ProductivityVSExtent of automation

Solution Approach 1:

The system performs preliminary actions by automatically generating tasks from product data before manual intervention is needed. Product information, including installation and maintenance requirements, is pre-processed to create project plan tasks automatically, eliminating the need for manual task creation and improving efficiency

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The project planning system performs self-service by automatically creating tasks from product data without requiring manual input. The system uses product information to generate, assign, and schedule tasks autonomously, reducing human error and increasing productivity while maintaining operational flexibility

Inventive Principle:
Principle #25Self-service

2Productivity

If product data is used to automate task generation, then productivity and efficiency are improved, but system complexity increases due to integration requirements

Engineering Contradiction:
Improveproject plan creation speedVSAvoidsystem integration complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The system applies universality by using a single product data structure to serve multiple functions: generating project plans, creating tasks, assigning resources, and scheduling activities. This multi-functional approach increases productivity while managing complexity through a unified data model that works across different project planning operations

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Loss of time

If manual task assignment is used, then adaptability in resource allocation is maintained, but time consumption and human error increase

Engineering Contradiction:
Improvetask assignment timeVSAvoidresource allocation flexibility
Core Design Contradiction:
Loss of timeVSAdaptability or versatility

Solution Approach 1:

The system uses feedback mechanisms to maintain adaptability in resource allocation. Product data includes information about installation and maintenance requirements that feed back into task assignment decisions, allowing the system to automatically allocate resources appropriately while reducing time consumption and human error

Inventive Principle:
Principle #23Feedback

Data Source

PatentUS20220374818A1Project scheduling and management system that uses product data with product classes
Publication Date: 2022.11.24 CONNECTWISE LLC
  • US20220374818A1 patent drawing
  • US20220374818A1 patent drawing
  • US20220374818A1 patent drawing

AI summary

Systems and methods of the present disclosure facilitate scheduling and managing a project. In some embodiments, the system includes a quoting module, a product data module, and a project planning module executing on at least one processor of a server. The product data module may be configured to store at least one product. The product stored in the project module may have a product class indicating that the product is a labor product, parts product, or agreements product. The system may be configured to copy products from the product data module to the quoting module. The system may be configured to also copy products from the product data module to the project planning module, and generate tasks for the project planning module based on the products.