Problem

Current construction practices rely on temporary weather protection solutions for building materials during transport and installation, which are often ineffective and result in waste, as they need to be removed before installation, leaving the materials vulnerable to damage.

Innovation Solution

A protective layer comprising multiple sublayers such as polymeric, adhesive, water-resistant, and breathable layers is integrated with building materials like structural panels and roofing materials, allowing it to remain in place during transport and installation, providing comprehensive weather protection and eliminating the need for temporary covering.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Object-affected harmful factors

If temporary covering solutions are used to protect building materials during transport and installation, then protection from weather is provided, but the materials are vulnerable to damage after removal and waste is generated

Engineering Contradiction:
Improveweather protectionVSAvoidwaste material
Core Design Contradiction:
Object-affected harmful factorsVSLoss of substance

Solution Approach 1:

The protective layer is merged with the building material itself through adhesive bonding, creating an integrated structure where the protection becomes part of the final product. This eliminates the need for separate temporary coverings that must be removed and discarded, thereby reducing waste while maintaining continuous protection.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The protective layer is applied to the building material in advance at the factory before transport and installation. This preliminary protective action ensures the material is protected from the start of the supply chain through to installation, eliminating the vulnerability period that occurs with removable temporary coverings.

Inventive Principle:
Principle #10Preliminary action

2Ease of operation

If temporary covering solutions are removed prior to installation, then the building materials can be installed, but the materials become vulnerable to weather and handling damage

Engineering Contradiction:
Improveinstallation processVSAvoidprotection during installation
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

By bonding the protective layer to the building material, the protection travels with the material through all handling and installation operations. The protective layer becomes an integral part of the material rather than a separate component that needs to be removed, ensuring continuous protection without interfering with the installation process.

Inventive Principle:
Principle #5Merging (Combining)

3Reliability

If a protective layer is adhesively bonded to building materials, then continuous protection is provided during transport and installation, but the adhesive bond must maintain strength under various conditions

Engineering Contradiction:
Improveprotective layer retentionVSAvoidadhesive bond strength
Core Design Contradiction:
ReliabilityVSStrength

Solution Approach 1:

The adhesive properties are optimized by adjusting parameters such as adhesive composition, bond strength, and bonding conditions to ensure the protective layer remains securely attached during transport, handling, and installation while allowing for proper adhesion to the building material surface.

Inventive Principle:
Principle #35Parameter changes

4Loss of substance

If the protective layer remains in place after installation, then waste is eliminated and additional protection is provided, but the layer must not interfere with the building material's function

Engineering Contradiction:
Improvewaste eliminationVSAvoidbuilding material functionality
Core Design Contradiction:
Loss of substanceVSAdaptability or versatility

Solution Approach 1:

The protective layer is designed with specific local properties tailored to the building material and its application. Different areas or types of building materials receive protective layers with appropriate characteristics (e.g., permeability, flexibility, thickness) that maintain the functional requirements of each specific application while providing protection.

Inventive Principle:
Principle #3Local quality

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

The integrated protective layer effectively shields building materials from environmental elements and handling damage, reducing waste and installation time while maintaining protective properties post-installation, ensuring durability and resistance to weathering.

Implementation Method 1

each of the protective layers comprises a polymeric sublayer and an adhesive sublayer; wherein the adhesive sublayer of at least one of the plurality of protective layers is in contact with the first surface of the core of each of the plurality of building materials

Methodology Applied
Scientific EffectAdhesion: Adhesive

Data Source

PatentUS11407209B2Protective packaging membranes as integrated layer in building system components
Publication Date: 2022.08.09 BMIC LLC
  • US11407209B2 patent drawing
  • US11407209B2 patent drawing
  • US11407209B2 patent drawing

AI summary

Building materials such as structural panels, beams, roof decking, and flooring panels, are packaged within a protective layer including a sublayer of a polymeric material that can be applied at the factory. The protective layer protects the underlying building materials from exposure to weather and potential damage due to handling during shipping, at a job site, and which can be left in place during construction, thus eliminating the need for temporary protective measures covering the building materials. The protective layer may have additional properties such as breathability, fire resistance, and sound absorption. The protective layer also may provide an underlayment such as for flooring and roofing.