Rail Car Switching Logic for Block Pull Time Optimization

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current railroad switchyard management systems face inefficiencies in car switching operations, particularly due to delays in assembling train blocks, which can lead to cascading effects and significant financial penalties, as they require all cars to arrive before a train can depart, causing constraints in the network.

Innovation Solution

A system and method for computing car switching solutions in a railway switchyard that considers the pull time of a train block, allowing for the selection of switching options between classification tracks and reswitching tracks, using a processing entity to determine the optimal switching path based on the pull time information.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If a train block is assembled from cars arriving on different incoming trains, then the train block can be complete and available for departure, but if one or more cars are delayed, the entire departing train must leave without the train block, causing cascading effects and financial penalties

Engineering Contradiction:
Improvetrain block assembly reliabilityVSAvoidtrain departure delay
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent segments the train block assembly process by introducing intermediate storage tracks that allow partial assembly of train blocks. Cars can be stored individually or in groups on these intermediate tracks while waiting for other cars, allowing the departure train to leave with available cars rather than waiting for the complete block.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system performs preliminary actions by pre-positioning cars on intermediate storage tracks based on predicted arrival times and train block requirements. This allows the switching system to prepare for potential delays by having cars ready in advance on alternative tracks, enabling flexible reconfiguration when delays occur.

Inventive Principle:
Principle #10Preliminary action

2Manufacturing precision

If the switching system waits for all cars to arrive before assembling a train block, then the train block is complete, but this causes delays and constraints in the railroad network

Engineering Contradiction:
Improvetrain block composition accuracyVSAvoidswitching operation efficiency
Core Design Contradiction:
Manufacturing precisionVSProductivity

Solution Approach 1:

The patent implements dynamic switching decisions that adapt to real-time conditions. The system continuously monitors car arrivals and dynamically reconfigures train block assembly plans, switching between waiting for complete blocks and departing with partial blocks based on current status, thereby optimizing both accuracy and efficiency.

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The system changes the parameter of train block completeness from a fixed requirement to a flexible condition. By introducing intermediate storage tracks, the system allows train blocks to be assembled to varying degrees of completeness depending on car availability, transforming the rigid completeness parameter into a dynamic state that can be adjusted based on operational conditions.

Inventive Principle:
Principle #35Parameter changes

3Device complexity

If the switching system uses traditional methods without considering pull time, then the switching process is simple, but delays occur and cascade through the network

Engineering Contradiction:
Improveswitching solution complexityVSAvoidcar arrival time reliability
Core Design Contradiction:
Device complexityVSReliability

Solution Approach 1:

The patent incorporates feedback mechanisms that monitor car arrival times, track occupancy, and train block assembly progress. This feedback information is used to dynamically adjust switching decisions and pull time schedules, creating a closed-loop system that responds to actual conditions rather than following fixed predetermined plans, thereby improving reliability without excessive complexity.

Inventive Principle:
Principle #23Feedback

Data Source

PatentUS7885736B2System and method for computing rail car switching solutions in a switchyard including logic to re-switch cars for block pull time
Publication Date: 2011.02.08 CANADIAN NAT RAILWAY CO
  • US7885736B2 patent drawing
  • US7885736B2 patent drawing
  • US7885736B2 patent drawing

AI summary

A system for computing car switching solutions in a railway switch yard. The system is computer based and has an input for receiving data conveying information about one or more arrival trains arriving at the switch yard and data conveying information about departure trains to depart the switch yard. A processing entity processes the data and computes car switching solutions for the railcars.