Rail Welding Unit With Movable Shearing for Sleeper Clearance

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing welding units for rail tracks face challenges in minimizing rail tension and avoiding interference with sleepers during the welding and shearing processes, leading to potential adverse effects on welding quality.

Innovation Solution

A welding unit with a vertically adjustable shearing device, allowing the unit lower edge to be positioned close to the rail clamping jaws, enabling minimal or no rail lifting during welding and facilitating smooth shearing of the weld bead without rail tension issues, even if the shearing device lies above a sleeper.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If the unit lower edge is positioned close to the rail clamping jaws, then the welding operation is improved with minimal rail lifting, but the shearing device may interfere with sleepers during operation

Engineering Contradiction:
Improvewelding operationVSAvoidinterference with sleepers
Core Design Contradiction:
Ease of operationVSObject-affected harmful factors

Solution Approach 1:

The shearing device is elevated vertically above the unit lower edge, transitioning the shearing operation to a different vertical dimension. This allows the shearing device to clear sleepers during the welding phase while maintaining operational capability when needed

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

Solution Approach 2:

The shearing device is made vertically movable relative to the unit lower edge, allowing it to be positioned in different vertical locations depending on the operational phase - elevated during welding to avoid sleeper interference, and lowered during shearing to perform the cutting function

Inventive Principle:
Principle #15Dynamics

2Object-affected harmful factors

If the shearing device is elevated above the unit lower edge, then interference with sleepers is avoided, but the shearing operation requires additional lifting of the welding unit

Engineering Contradiction:
Improveinterference with sleepersVSAvoidlifting time for shearing
Core Design Contradiction:
Object-affected harmful factorsVSLoss of time

Solution Approach 1:

The welding operation is completed first while the shearing device is in its elevated position, avoiding sleeper interference during the critical welding phase. The rail is welded and cooled before the shearing device is lowered and the unit is lifted for the shearing operation, thereby eliminating rail tension issues

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS11717908B2Welding unit and method for welding rails of a track
Publication Date: 2023.08.08 PLASSER & THEURER EXPORT VON BAHNBAUMASCHINEN GMBH
  • US11717908B2 patent drawing
  • US11717908B2 patent drawing

AI summary

A welding unit for welding rails of a track has a unit lower edge forming a lower boundary of the welding unit, with regard to a vertical, and a shearing device provided for removing a weld bead. A rail base section of the shearing device is designed to be lowered, relative to the welding unit, by way of a drive from a rest position situated above the unit lower edge into a shearing position situated below the unit lower edge. Thus, the welding operation can be carried out without lifting the rails from the sleepers.