Railcar Switching Logic for Dynamic Track Allocation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current railroad switchyard management processes face inefficiencies due to delays in assembling train blocks, which can lead to cascading effects and significant financial penalties, as they require all cars to arrive before a train can depart, causing issues with car arrival time guarantees to customers.

Innovation Solution

A system and method for computing car switching solutions in a railway switchyard that assigns different orders of preference for available space on classification tracks for cars belonging to different train blocks, allowing for dynamic allocation and re-distribution to optimize switching operations.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If car blocking is used to increase switching efficiency, then productivity is improved, but reliability deteriorates due to cascading delays when cars are delayed

Engineering Contradiction:
Improveswitching efficiencyVSAvoidcar arrival time guarantee
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The patent implements dynamic train block management by allowing train blocks to be created, modified, and dissolved based on real-time car availability. Instead of rigid blocking where all cars must arrive before departure, the system dynamically adjusts block composition, allowing partial blocks to depart and be completed later, thus maintaining both efficiency and reliability

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The system performs preliminary actions by pre-assigning cars to train blocks and preparing departure trains in advance based on predicted car arrivals. This allows the system to proactively manage potential delays by having alternative car assignments ready, ensuring reliability while maintaining productivity

Inventive Principle:
Principle #10Preliminary action

2Reliability

If strict car blocking is enforced to ensure train block completeness, then reliability is improved, but productivity deteriorates due to waiting for all cars to arrive

Engineering Contradiction:
Improvetrain block completenessVSAvoidswitching operation speed
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The patent applies partial action by allowing train blocks to depart with only some of the required cars rather than waiting for complete sets. The system permits partial fulfillment of train block requirements, enabling departures to proceed with available cars while maintaining the option to add remaining cars later, thus improving productivity without completely sacrificing reliability

Inventive Principle:
Principle #16Partial or excessive action

3Reliability

If classification tracks are assigned rigidly to specific train blocks, then reliability is improved, but adaptability deteriorates when delays occur

Engineering Contradiction:
Improvetrack assignment consistencyVSAvoidresponse to car arrival delays
Core Design Contradiction:
ReliabilityVSAdaptability or versatility

Solution Approach 1:

The system implements dynamic track assignment where classification tracks are not rigidly bound to specific train blocks but can be reallocated based on real-time conditions. When car arrivals are delayed, the system dynamically reassigns tracks to alternative train blocks or dissolves and recreates blocks, maintaining adaptability while preserving reliability through consistent assignment rules

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

Classification tracks are designed with multi-functionality, capable of serving multiple train blocks and purposes depending on operational needs. A track assigned to one train block can be reassigned to another block or used for different functions when delays occur, enhancing adaptability while maintaining reliable operations through universal track utilization

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentUS7546185B2System and method for computing railcar switching solutions using an available space search logic assigning different orders of preference to classification tracks
Publication Date: 2009.06.09 CANADIAN NAT RAILWAY CO
  • US7546185B2 patent drawing
  • US7546185B2 patent drawing
  • US7546185B2 patent drawing

AI summary

A system for computing car switching solutions in a railway switch yard. The system is computer based and has an input for receiving data conveying information about one or more arrival trains arriving at the switch yard and data conveying information about departure trains to depart the switch yard. A processing entity processes the data and computes car switching solutions for the railcars.